Laserfiche WebLink
SWRCB,January 2002 Page of <br /> �` 9. SPILL/OVERFILL CONTAINMENT BOXESco v <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Professional Engineer <br /> Other(Sped) <br /> Test Method Used: Pressure Vacuum rosta is <br /> Other(Sped) <br /> k Equipment Resolution: <br /> Test Equipment Used: owl'1 11 111 oil <br /> 1111 If <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: 1 t /t ( � It t 1 l k l l t k t <br /> Bucket Depth: 'ii <br /> Wait time between applying <br /> pressure/vacuum/water and Q M <br /> starting test: <br /> Test Start Time: �dt(sv )� (,v fU" Grp (4' J �� <br /> Initial Reading(Rj): (4Z rr 3� �� -7 (/ - <br /> Test End Time: 00 '`� <br /> Final Reading(RF): p <br /> it �/� --77 <br /> Test Duration: 11 N1l !Z <br /> Change in Reading(RF-Rj): AA <br /> Pass/Fail Threshold or f� <br /> Criteria: e SS C.SS r�S S �^S S � 1c;as <br /> Test Result: <br /> 7 s P/t,h ? 5 ph,. d'7 rr�- 7 rte- 6 sirs <br /> Comments— (include informa ion o esting, and recommended follow-up for failed tests) <br />