Laserfiche WebLink
Site Address: SS #6100, 25775 S. Patterson Pass, Tracy Date of Testing/Servicing: 3/1(,/03 <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . .iul�. . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . .. . . . . . . . . . . . . . . . <br /> Ll �'Jt_( . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . <br /> ---------- <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> lsY <br /> V <br /> fa <br /> . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. <br /> . . . .. . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . <br /> . . . 4w ` 5-8 c) <br /> Date map was drawn: 3 :3 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br /> dispenser pans, ill containers, or other secondary containment areas; mechanical or electronic line leak <br /> spaces, sumps, di spill <br /> detectors; and in-tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br /> was prepared. <br /> Page of 05/00 <br />