My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2003 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
BILLING 2003 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 1:10:44 PM
Creation date
2/13/2019 4:09:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2003 - 2009
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN -PAGE 1 (One form per facility) <br /> TYPE OF ACTION ❑ L NEW PLAN 2.CHANGE OF INFORMATION Rot. <br /> FACILITY ID# (Agency Use Only) <br /> FACILITY NAME Roz. <br /> P , <br /> FACILITY SITE ADDRESS R03 CITY R04. <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> D Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective. It will then be managed properly.Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. <br /> ➢ Facility personnel will determine whether or not any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,andthe added material or resulting material from such a combination is not compatible with secondary containment. <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if a licable <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO. R20. R30. <br /> RI I. R21. R31. <br /> R12. R22. R32. <br /> R13. R23. R33, <br /> R14. R24. R34. <br /> R15. R25. R35. <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rao. TITLE R50. <br /> L" (, <br /> NAME Ral. TITLE R51. <br /> NAME Rat_ TITLE R52, <br /> NAME R43. TITLE R53 <br /> This information is required mly when the presence of the hazardous substance can not be determined directly by the monitoring method used(e.g.,where liquid level <br /> measurements in a tank annular space or secondary piping are used as the basis for leak determination). <br /> THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br /> CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br /> R60. <br /> SJCEHD-e(06/03)-1/3 06/25/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.