Laserfiche WebLink
West Byron Road Project <br /> Tracy, San Joaquin Co. 19 April 200+ <br /> RE COIYIMDNDATIONS I <br /> Based on review of the previous and current findings discussed in the attached memorandum, we concur <br /> that additional borings are needed for delineating impacts to soil and groundwater. We have the <br /> following general recommendations regarding placement of proposed additional borings: <br /> • One boring south of and midway between SB-2 and SB-3; <br /> • One boring south of SB-6; <br /> • Two borings -diagonally southwest and southeast of SB-8; <br /> • One boring south and midway between SB-11 and SB-12; <br /> • One boring south of SB-19; <br /> • One boring south of SB-23; ' <br /> • One boring south of SB-25 (Caldrons Store property); and, <br /> • One to two borings southeast of SB-33 within the area occupied by a storm water basin. <br /> By 15 July 2004 please provide a plan and time schedule for delineatingthe extent ofs <br /> groundwater impacts as described above- oil and <br /> If you have any questions or comments,please contact Dean Hubbard at(559) 445-5179. ' <br /> SHELTON R. GRAY C. DEAN HUBBARD <br /> Senior Engineering Geologist_ <br /> Engineering Geologist <br /> RG No. 6357 <br /> cc: Michael Infuma, Jr.,San Joaquin County EHD Stockton ' <br /> Luis Mercado, SAIC,Sacrameiitb.y <br />