Laserfiche WebLink
CHhV EMC SUPRFND Vel Me UOU6 UV/11 'U6 15:6( NQ.Y)d U5 <br /> Scott Mansholt -2 A 9 September 2003 <br /> hevronTexaco <br /> West 13yron Road Corridor <br /> groundwater sam.ples should r.ncl.u.d.e Notal petroleum hydrocarbons as gasoline(7°PH-g), benzene, <br /> toluene,, ethylbenzenc, and xylene (BTE,X), and.rnerh.yl tertiary butyl. cth.er(M'J3E). <br /> 2. Sinnil.a,r.•ly, we concur with the consultants proposal to advance additional borings north.ofCh.e Sou,7a <br /> property within the Byron Road easement,to collect.soil. and.groundwater samples for a,rr.alysis. <br /> $i.milarly, as described above, at least four groijudwa.ter sarnples should,be obtained, for analysis ftom. <br /> borings Without free prod- <br /> uv-3. Off-site soil and.groundwater information needs to be provided dor the Caldron's Store leaking <br /> undergroundstorage tank(UST) investi.gatioti, c:on.t'irm,ing that leaks have not migrated down.gradienf <br /> into the Byron Road easern.ent. If the informatiori ca.n.n.ot be obtained., a soil boring(s) shou.l.d, be <br /> advanced north of the store and. form,er US's"exca-vation.to collect soil and groundwater sarn.ples. Soil <br /> and groundwater samples should be analyzed for petroleum.hydrocarbon. a.n.al.ysi.s as described in <br /> item#1 above. <br /> 4. During PG&E's March 2003 investigation Within.the Byron Road easei..en.t, north,of the Monterosso <br /> property,concentrations of TPH-g were i.dendfied in soil and.groundwater. we reoom.m.en.d that an <br /> additional boring(s) be advanced near PG&E boring B-1.0 and in the vicinity of borings )3-14 and 1.5, to <br /> collect soil a,n.d.grouDdwa.t.er samples for ana-lysis as descrIbed in item#1 above. <br /> . The wel.1. survey and search has i,denti,fied several, private domestic water weals along the south side of <br /> Byron Road from.the McCorrn.ack proper,ty to Jmer.st_at.e 205. We recommend.tb.at a.grou.n.d.water <br /> sam.pl.e be obtained frora the wells and submitted,for petroleum.hydrocarbon analysis as described in <br /> i.tel.n.#I above. <br /> hevaronTexico and Regional Boardstaff, to expedite d)e characterization' process during tb,e course of the <br /> investigation.work, will review the results of analysis and.field observations to d.et:ermi.ne the need for <br /> additional borings a.n.d sampling. <br /> We con-cu-r with the 18 August 2003 West Byron Road Corridor workplan, provided our cotr).mQn.ts oudi.n.ed <br /> above.are addressed. <br /> Jf you ba.ve any questions or comments, please contact Dears.Hubbard at(559) 44-5-51.79. Please notify <br /> Regional.Board staff at least.48 hours prior to corn.m.encin.g the field investigation and.drilling acti.viti.es. <br /> Senior.Engineering Geologist Associate Engineering Geologist: <br /> RG No. 6357 <br /> cc: Mr. Mike Infurna, Barr Joaquin County Public I-Teal.th Services,Stockton <br /> :r. Garrett Turner, SATC, Qaklaind <br /> Mr, Gary Foote, Georn.a.trix, Oakland. <br />