My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BYRON
>
0
>
2900 - Site Mitigation Program
>
PR0517323
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 10:29:19 AM
Creation date
2/14/2019 9:39:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0517323
PE
2960
FACILITY_ID
FA0013339
FACILITY_NAME
MT HOUSE SITES 1-6
STREET_NUMBER
0
STREET_NAME
BYRON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
BYRON RD
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' • • <br /> Mr.M. Scott Mansholt—CEMC March 31,2005Pa e 3 of 5 <br /> Site Investigation Work Plan,Mountain House Site#6 g <br /> PERMITTING AND ACCESS <br /> ' Prior to conducting field activities, SAIC will obtain soil boring permits from the San Joaquin County <br /> Public Health Services(SJCPHS). Access to advance any borings located in the Mountain House <br /> Community Services District(MHCSD)ROW will require an encroachment permit and traffic control. <br /> ' SAIC will prepare the encroachment permit application and traffic control plan and submit both <br /> documents to MHCSD for approval. If required, CEMC will post a performance bond for work <br /> conducted in the MHCSD ROW. The proposed borings are likely to be located on private property and <br /> will require an access agreement. CEMC will secure access to these properties prior to any fieldwork. <br /> A site-specific health and safety plan(HASP)will be prepared prior to any field activities. The HASP <br /> will include driving directions to the nearest hospital,a hospital route map,and job safety analysis of the <br /> ' work activities to be performed. The HASP will be kept on site, reviewed daily with all on-site <br /> personnel, and made available for review during investigation activities. <br /> While marking proposed boring locations,potential safety concerns and obstacles to the proposed scope <br /> of work will be observed and noted, such as overhead lines, marked and unmarked underground lines, and <br /> pedestrians and automobile traffic. Underground Service Alert(USA)will be notified of all proposed <br /> boring locations at least 48 hours prior to any intrusive field activities. All USA ticket alerts will be <br /> confirmed and cleared prior to any intrusive field activities. In addition, SAIC will subcontract a private <br /> utility locator to clear the proposed boring locations for underground utilities. All fieldwork will be <br /> conducted in accordance with SAIC's standard operating procedures(SOPS). <br /> ' WATER WELL SEARCH <br /> SAIC will conduct a search of DWR files to obtain information on water production wells used for <br /> domestic, irrigation,municipal, and/or other uses within a 2,000-foot radius of the site. A copy of the <br /> Well Completion Report Release Agreement—Agency Form will be forwarded to the RWQCB for <br /> authorization and signature. Following this search SAIC will prepare a table containing the State Well <br /> ' Number, location, and water use(if available), which will be included in the soil and grab groundwater <br /> investigation report. <br /> SOIL BORINGS <br /> ' Based on the results presented in the Condor report(2001),soil borings will be advanced to a targeted <br /> depth of 30 feet bgs and a maximum of 35 feet bgs. Direct-push technology will be used to advance the <br /> proposed soil borings. The borings will be continuously cored and field screened using a photoionization <br /> ' detector to detect the presence of residual petroleum in soil. The soil will be logged in general <br /> accordance with the Unified Soil Classification System as presented in ASTM 2488-90 and under the <br /> supervision of a California Registered Geologist. All down-hole equipment will be cleaned using a <br /> Liquinox/water solution to prevent the possibility of cross contamination between consecutive boring <br /> locations. The proposed boring objectives presented in Table 1 outline the areas of investigation adjacent <br /> to the former OVP ROW and purpose of the proposed soil boring locations shown on Figure 2. <br /> ' SAIC proposes to collect soil samples from selected borings for use in a future human health risk <br /> assessment(HI-IItA). These soil samples will be collected from an approximate depth shallower than 10 <br /> feet bgs from the proposed soil borings. SAIC will submit a minimum of one soil sample from the upper <br /> 10 feet of borehole at either the 1 foot or 5 feet-bgs interval if no impacted soil is observed to the depth of <br /> 10 feet bgs,or above groundwater if water is observed shallower than 10 feet bgs. However, if affected <br /> soil is observed above 10 feet bgs, SAIC will collect a soil sample for HHRA purposes from the most <br /> ' affected interval. Soil samples collected for the HHRA will be analyzed for the same constituents as all <br /> other samples. However, soil samples collected for HHRA purposes will be analyzed using a detection <br /> limit that is sensitive(low) enough to detect concentrations of constituents that are not of human health <br /> concern. <br />
The URL can be used to link to this page
Your browser does not support the video tag.