Laserfiche WebLink
Mr. M. Scott Mansholt—CEMC March 31,2005 <br /> Site Investigation Workplan, Mountain House Sites#4 and #5 Page 5 of 5 <br /> REPORTING AND SCHEDULE <br /> Upon completion of all field activities described above and receipt of all analytical results, SAIC <br /> will evaluate whether soil and groundwater has been delineated at the subject site and will <br /> prepare a subsurface investigation report summarizing the field activities and observations,the <br /> laboratory analytical results, and our conclusions and recommendations. <br /> The subsurface investigation report will include the following: <br /> • Description of drilling methods and boring logs; <br /> • Description of soil and groundwater sampling methods and procedures; <br /> • A summary of soil and groundwater analytical test results; <br /> • A site plan with new boring locations; <br /> • A tabulation of soil and groundwater data; and <br /> • Copies of the laboratory analytical report. <br /> SAIC will begin the permitting and administrative work 2 to 3 weeks after receiving a Notice to <br /> Proceed from CEMC. SAIC proposes to begin the investigation following approval of the <br /> workplan and after obtaining all necessary permits, bonds, and access agreements described in the <br /> scope of work. <br /> CLOSING <br /> Please call Todd Del Frate at 916-979-3741 if you have any questions,comments, or need to <br /> discuss this scope of work in more detail. <br /> Sincerely, <br /> SCIENCE APPLICATIONS INTERNATIONAL CORPORATION <br /> D GFD�O <br /> /V'P� cr <br /> _. 0 O� <br /> Lee Ignat lcz d Del Frate, . 7394 <br /> Project a scientist Senior Project anager Nom, Na 738e �e <br /> FOF CAL��O <br /> Attachments: <br /> Figure 1: Site Vicinity Map <br /> Figure 2: Site Map and Historical Boring Locations <br /> Figure 3: Detailed Site Map with Historical and Proposed Boring Locations: <br /> Mountain House Site#4 <br /> Figure 4: Detailed Site Map with Historical and Proposed Boring Locations: <br /> Mountain House Site#5 <br /> Table 1: Proposed Boring Objectives <br />