My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
300
>
3500 - Local Oversight Program
>
PR0544147
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 12:10:00 PM
Creation date
2/14/2019 11:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544147
PE
3526
FACILITY_ID
FA0004522
FACILITY_NAME
SKIPS SERVICE STATION
STREET_NUMBER
300
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14909501
CURRENT_STATUS
02
SITE_LOCATION
300 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SERVICTS ,oP :�o <br /> SAN JOAQUIN COUNTY 2: c <br /> ENVIRONMENTAL HEALTH DIVISION ' <br /> Karen Furst, M.D., M.P.H., Health Officer �. P <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 R� <br /> 209/468_3420 FILE <br /> MICHAEL D & SHARON OLIVAREZ AUG 2 3 1999 <br /> 436 SCOTTS AVENUE <br /> STOCKTON CA 95203 <br /> Re: Skips Service Station Site Code: 1038 <br /> 300 S. California St. <br /> Stockton CA <br /> San Joaquin County Public Health Services Environmental Health Division (PHS/EHD) <br /> approved a Work Plan for CPT Borings to Determine Lateral & Vertical Extent of <br /> Contamination on May 19, 1999 prepared by Foothill Engineering for the above <br /> referenced site. PHS/EHD approved the Work Plan with the condition that all work was <br /> to have been completed within 90 days of the Work Plan approval date. The CPT boring <br /> and well survey work as outlined in the above referenced Work Plan has not occurred. <br /> The work as outlined in the approved Work Plan must be completed by October 1, 1999. <br /> If work is not completed within that time frame the site will not be in compliance with <br /> PHS/EHD directives and reimbursement for corrective action costs from the State Water <br /> Resources Control Board Cleanup Fund may be jeopardized. <br /> A well permit application with encroachment permits as required and $89.00 permit fee <br /> should be submitted to PHS/EHD as soon as possible. After the permit has been issued <br /> the work can be scheduled. Contact Carol Oz, Senior REHS. 48 hrs. prior to inspection <br /> or if you have questions regarding this letter. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Carol Oz, Senior REHS Margaret Lagorio, REHS <br /> Site Mitigation Unit IV Supervisor <br /> cc: Mark List-CVRWQCB <br /> Ery Rifenburg, PE, Foothill Engineering <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.