My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
300
>
3500 - Local Oversight Program
>
PR0544147
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 12:16:02 PM
Creation date
2/14/2019 11:47:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544147
PE
3526
FACILITY_ID
FA0004522
FACILITY_NAME
SKIPS SERVICE STATION
STREET_NUMBER
300
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14909501
CURRENT_STATUS
02
SITE_LOCATION
300 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VIRONMENTAL HEA LTFI DIVISION FOOTHILL <br /> 304 E.Weber Ave. Third Floor ENGINEERING <br /> P. O. Box 388, Stock CA 95201-0388 1 793 PADDY CREEK LANE LODI. CA 95240 <br /> Approved H. <209) 368-9381 FAX (209) 367-1163 <br /> Denied ❑ <br /> Conditions <br /> April 28, 9 Modified @ the request of C. Oz 5/12/99 <br /> Ms. Carol <br /> San Joaquin County u ervices <br /> Environmental Health Division <br /> R O. Box 388 <br /> Stockton, CA 95201 <br /> �10ie& <br /> Site Code 41038 <br /> q0& ub ect: Michael D. & Sharon Olivarez, <br /> � j 300 S. California St. Stockton, Ca. <br /> Work Plan for CPT Borings to Determine Lateral & Vertical Extent of Contamination <br /> SuXt nom' <br /> Dear Ms. Oz, <br /> As per your request of March 19, 1999, please find below a Work Plan for additional borings, <br /> la,�d hydrology survey, soil and water sampling for the above stated site. <br /> WORK PLAN FOR CPT BORINGS and MONITORING WELL REPLACEMENT <br /> Site History <br /> Five fuel USTs and one used motor oil tank were removed by Jim Thorpe Oil in November 1992 <br /> S under permit from the PHS/EHD. Soil samples taken from under the USTs and dispensing <br /> equipment indicated the presence of hydrocarbons. Spoil from the excavation was found to contain <br /> P� hydrocarbon contamination. <br /> Clearwater Group submitted a Work Plan to install three soil borings with monitoring wells <br /> constructed in the same boring. The work described in the Clearwater Work Plan was completed in <br /> PW March of 1995. <br /> f The excavation for the removal of the USTs was backfilled by Jim Thorpe Oil in April 1996. The <br /> excavation spoil was used for backfill material. <br /> C, {° <br /> Foothill Engineering was requested by the owner to sample the three monitoring wells that were <br /> 101%,, installed by Clearwater at various times and the analysis of those samples is attached. Monitoring <br /> c� D wells MW-1 and MW-2 continue to contain high levels of gasoline contamination.MW-3 has much <br /> r�(�f�+ lower levels of gasoline contamination(see data sheet attached). <br /> Proposed CPT Borings <br /> The groundwater gradient of the three existing monitoring wells is to the northeast. The proposed <br /> CPT borings are to be placed on a +/-100' radius from the center of the UST excavation. This is <br /> about double the radius of the existing monitoring wells. CPT #1 is located just north of the UST <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.