My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
300
>
3500 - Local Oversight Program
>
PR0544147
>
FIELD DOCUMENTS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 12:35:00 PM
Creation date
2/14/2019 11:50:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 2
RECORD_ID
PR0544147
PE
3526
FACILITY_ID
FA0004522
FACILITY_NAME
SKIPS SERVICE STATION
STREET_NUMBER
300
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14909501
CURRENT_STATUS
02
SITE_LOCATION
300 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5FOOTHILL <br /> I <br /> XC:Lo 2X 10 I <br /> ENGINEERNG <br /> 8442 STORY RIDGE WAY ANTELOPE,CA 95843 <br /> PH:(916)729-5 .(91 6)729-0593 <br /> 10 April 16, 2012 <br /> Mrs.Lisa Medina, RENS <br /> San Joaquin County Public Health Service <br /> Environmental Health Department <br /> 15 600 East Main Street <br /> Stockton, CA 95202-3029 Site Code#1038 <br /> Global ID#T0607700605 <br /> Subject: Michael D. & Sharon Olivarez Property at 300 S. California St. Stockton, Ca. <br /> 20 Fist Quarter 2012 Monitoring Report. <br /> Dear Mrs. Medina: <br /> Please find below the report covering the first quarter 2012 monitoring activities on the above <br /> stated property. <br /> 25 <br /> FIRST!QUARTER 2012 MONITORING REPORT <br /> 1. SITE HISTORY <br /> Five fuel USTs and one used motor oil tank were removed by Jim Thorpe Oil in November 1992 <br /> 30 under a permit from the PHS/EHD. Soil samples taken from under the USTs and the dispensing <br /> equipment indicated the presence of hydrocarbons. Spoil from the excavation was found to <br /> contain hydrocarbon contamination. <br /> The Clearwater Group submitted a work plan to install three soil borings with monitoring wells <br /> 35 constructed in the same boring. The work described in the Clearwater Work Plan was completed <br /> in March of 1995. <br /> The excavation for the removal of the USTs was backfilled by Jim Thorpe Oil in April 1996.The <br /> excavation spoil was used for backfill material. <br /> 40 <br /> Foothill Engineering was requested by the owner to sample the three monitoring wells that were <br /> installed by Clearwater at various times and the analysis of those samples is attached. <br /> 1 of 82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.