Laserfiche WebLink
EL-TECHGEOTECHNICALSUPPORT SERVICES, INC. <br /> MONITORING KELL FIELD LOG 2012 <br /> SAMPLE LOCATION 11VIW- 1 R DATE: 3123/2012 <br /> PROJECT NAME: OLIVAREZ PROPERTY ANALYSIS PERFORMED: SEE CHAIN 01,CUSTODY <br /> ADDRESS: 300 S.CALIFORNIA STREET SAMPLE TIME: 14:36 <br /> CITY,STATE: STOCKTON,CA. SAMPLE CONTAINERS: 4 V.0,A.'s <br /> SITE CONTACT- NONE PRESERVATIVES: I-ICL <br /> CONSULTANT: FOOTHILL ENGINEERING LAB.ANALYSIS BY: CASTLE <br /> 77771 <br /> PROJECT MANAGER: MIKE VLACH MONUMENT: FLUSH <br /> SAMPLER. DEL-TECH/ASHLEY LIGHT WELL CASING MATERIAL: PVC <br /> SIGNED: WELL CASING DIA.: 2" 1 0.1632 <br /> SAMPLE MEDIA: GROUNDWATER P.I.D.READING I ODOR: N/A MUSTY/FUEL <br /> TOP OF CASING ELEVATION: MSL COLOR: BLACK TO CLEAR <br /> DEPTH TO NATER: (feet.100th's) 26.55 FEET C _LC.PURGE VOL.: 1.26 <br /> DEPTH OF WELL: (feet.100th's) 34.28 FEET TOTAL VOLUME PURGED: 3 GAL. <br /> STANDING WATER COLUMN: 7.73 FEET DEPTIIOFPUMP: 33 FEET <br /> FIELD PARAMETERS <br /> TIME cumULATIVE ACTUAL DRAW PUMPING PH E.C. TEMP. O.R.P. DISSOLVED COLOR <br /> CASING VOLUME VOLUME DOWN RATE OXYGEN <br /> PURGED (D.1%v (Mvolts) (ppm) <br /> PER PURGE (units) (us/cm) (Celsius) <br /> 0 0 N/A 0.5 GPM 7,06 2059 215 -83 0.5 BLACK <br /> 1.26 1 7.16 1957 22.4 -46 0.7 <br /> 2.52 2 .18 1943 22.4 -11 0.9 <br /> 3.78 3 7.16 1947 22.5 -20 Lo CLEAR <br /> PURGE METHOD: DEDICATED WATERRA TUBING&PUMP.. <br /> SAMPLE METHOD: DEDICATED WATERRA TUBING, <br /> MT.W.AFTER PURGE- D.T.W.AT SAMPLrl,TIME: 28.07' <br /> WELL INTEGRITY: CAP&SEAL ARE SECURE. LOCK INS'T'ALLED. <br /> WELL LOCATION- SEE SITE MAP, <br /> REMARKS: <br /> WEATHER: CLEAR SKIES/WARM. WIND: NW5 <br /> QUALITY CONTROL: ALL PURGING EQUIPMENT TAS CLEANED AS NECESSARY. <br /> DEDICATED PURGE TUBING IS INSTALLED IN EACH 1,11ELL, <br /> CONTAINMENT: D.C.T. 17 55 GAL,STEEL DRUMOR 60 GAL.POLYDRUM. <br /> INSTRUMENTATION: Y.S.I.556 MULTIPROBE SYSTEM Y.S.I.DISSOLVED OXYGEN NIETER <br /> SOLINIST SLOPE METER <br /> 58 of 82 <br />