My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000984
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
300
>
3500 - Local Oversight Program
>
PR0544147
>
ARCHIVED REPORTS XR0000984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 2:22:10 PM
Creation date
2/14/2019 1:23:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000984
RECORD_ID
PR0544147
PE
3526
FACILITY_ID
FA0004522
FACILITY_NAME
SKIPS SERVICE STATION
STREET_NUMBER
300
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14909501
CURRENT_STATUS
02
SITE_LOCATION
300 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEARWATER <br /> G R'.O U P, I N C. <br /> Conduct soil vapor extraction and groundwater extraction pilot-tests--at the <br /> site'after soil and groundwater contamination have been delineated <br /> • Select an appropriate remediation method. <br /> 2.0 PROPOSED WORK <br /> Clearwater proposes to conduct the, following tasks at the subject, location <br /> during four phases of,work: . <br /> ` Phase 1: {Tasks to:be conducted concurrently} <br /> characterize and dispose of the soil currently stockpiled > <br />' Compare the cost of shoring the excavation and removing additional soil <br /> to, the,cost of leaving the soil in place and remediating it in situ (by soil <br /> vapor extraction). <br /> Phase 2: Conduct one of the following tasks after removing,vegetation <br />' from the bottom of the excavation: <br /> •' Install shoring, remove additional soil, collect samples from the bottom of <br /> the excavation, and backfill and compact the exca_vation . <br /> • Backfill and compact theexcavation. <br /> Phase 3: <br /> + Pave the:slirface.in.the vicinity of the' backfilled excavation <br /> • Drill,- sample; and-install 5 groundwater: monitoring wells <br /> i Drill and sample.4 soil borings that will be converted to soil"vapor <br /> extraction wells. <br /> -Phase 4 <br /> • ` Conduct-pilot studies to evaluate-soil and groundwater'remediation <br />.. .:� :methods. <br /> 0_105WP 7/95, 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.