My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000985
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
300
>
3500 - Local Oversight Program
>
PR0544147
>
ARCHIVED REPORTS XR0000985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 2:53:15 PM
Creation date
2/14/2019 1:24:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000985
RECORD_ID
PR0544147
PE
3526
FACILITY_ID
FA0004522
FACILITY_NAME
SKIPS SERVICE STATION
STREET_NUMBER
300
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14909501
CURRENT_STATUS
02
SITE_LOCATION
300 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEARWATER <br /> •� G R Q U P, I N C. <br /> CLEARWATER FIELD PROCEDURES <br /> Well Installation, Soil Sampling, Well Development and <br /> Groundwater Sampling <br /> Drilling and Soil Sampling, = <br /> Prior to drilling, Clearwater Group,'Inc. (CGI) will obtain-all necessary permits <br /> and also locate All underground :. and- above ground -utilities through <br /> Underground Service Alert.(USA) and thorough site inspection. All drilling <br /> equipment will be inspected daily and-will be-maintained in safe operating <br /> condition. <br /> All borings will be drilled using a truck-mounted hollow-stern auger drill rig, _ <br /> unless site conditionswarrant a different drilling method.. All down-hole <br /> drilling. equipment will be steam cleaned prior. to arriving.ori-site, to prevent <br /> the introduction of contaminants from off-site.. . Working components of the <br /> drill rig near the borehole, as well as augers and drill rods will be:thoroughly <br /> steam. cleaned between each boring location. All 'drilling and sampling <br /> methods will be consistent with ASTM Method D-1452-80 and local, state and <br /> federal regulations. <br /> Soil samples are typically collected every 5 feet using brass tubes fitted in a <br /> California-modified split spoon sampler. If copper or zinc contamination is <br /> the subject of the investigation, stainless steel liners.will be used instead of <br /> brass. - Additional soil samples may be collected based upon significant <br /> changes in lithology or in areas of obvious soil contamination. . For sample <br /> collection, the split spoon sampler is driven 18 to 24 inches-past the lead auger <br /> by a 140-pound hammer falling a minimum of 30 inches. The number of <br /> Iblows necessary to drive the sampler and the amount of soil recovered will be <br /> recorded on the field exploratory soil boring log. The soil sampler and-liners <br /> will be cleaned with an Alconox solution and rinsed with tap water prior to <br /> each sampling event. <br /> Soil removed from the top two liners Will-be used for lithologic descriptions <br /> I (according to the unified soil classification system) and for organic vapor field <br /> analysis... Organic vapors will be analyzed in the field by placing in a plastic <br /> bag or glass jar approximately. 30 grams of soil. from an undisturbed soil <br /> sample. The bag or jar will'be sealed and warmed for approximately 20 <br /> minutes, then pierced. The head space in the bag will be tested. for total <br /> 1 <br /> CLEARWATER GROUP, MC. April 28, 1995 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.