Laserfiche WebLink
' 1.0 PURPOSE <br />' This Site Safety Plan (SSP) establishes the basic safety guidelines and requirements for <br /> the above scope(s) of work at the above site (see Site Location Map - Figure 1). This SSP <br /> addresses the expected potential hazards that may be encountered during this project. <br />' The provisions set-forth in this SSP will apply to Clearwater Group, Inc. (Clearwater) <br /> employees and any subcontractors working for Clearwater at the job site. All personnel <br />' working for Clearwater, including subcontractors, at the job site must read this SSP, and . <br /> sign the attached Compliance Agreement (Appendix A) before entering the work area. <br /> 20 FACILITY BACKGROUND <br /> 2.1 Site Layout and History (Site location is shown on Fig. 1, site ma 2 <br /> g P on Fig.g ) <br /> Previous Site Operations: Cnss� o„/aFrom: To: <br /> T <br />' From:—To:— <br /> Is <br /> rom: To:Is site currently active? Yes No <br />' Work surface is: Asphalt Concrete Gravel/Dirt <br /> ASTs/USTs present?: Yes N Location: <br /> . Number of USTs removed: Location: Ilo • Date removed: 11Z- <br /> 2.2 Soil Contamination <br /> Maximum benzene concentration in soil.: ND L ZS f1? ocation: <br /> Maximum.TPH concentration in soil: ` 500 a 0 <br /> Y <br /> 2-3 Ground Water Wells and Contamination <br /> Number of monitoring wells at the site: <br /> Maximum dissolved benzene concentration to date: N /A Well: <br /> Latest maximum dissolved benzene concentration: K //\' Well: <br /> 2.4 Remediation <br /> Previous remedial system operation: V%Owl From To: <br /> Active remediation: <br /> Number of SVE wells: *t ' AS wells:. 1A- _GWE wells: N t <br /> Other (trenches, sumps,..): <br /> Remediation equipment on site: her,e,- <br />