Laserfiche WebLink
1 <br /> 10.0 KEY SAFETY PERSONNEL AND RESPONSIBILITIES <br /> All personnel working for Clearwater at the job site are responsible for project safety. <br /> Specific.individual responsibilities are listed below: <br /> IProject Manager: fZU J � <br /> The Project Manager is responsible for preparation of this SSP. He/she has the <br />' authority. to provide for the auditing of compliance with the provisions of this <br /> SSP, suspend or modify work practices, and to report to the Regional Manager <br />' any individuals whose conduct does not meet the provisions presented in this <br /> SSP. The Project Manager can be reached at (510) 337-$730. <br />' Site Safety Officer. <br /> The Site Safety Officer (SSO) is responsible for the dissemination of the <br /> information contained in this SSP to all Clearwater personnel working at the job <br /> site, and to the responsible representative(s) of each subcontractor firm working <br /> for Clearwater at the job site. <br />' The SSO is responsible for.ensuring the following items are adequately addressed: <br /> Ile Inspection of tools, drilling equipment and.safety equipment <br /> • Safety supplies & equipment inventory <br /> • Site-specific training/hazard communication <br /> • Accident/incident reporting <br /> • Decontamination/contamination reduction procedures <br />' The Site Safety Officer shall be responsible to take necessary steps to ensure that <br /> employees are protected from physical hazards, which could include; <br />' 0 Falling objects such as tools or equipment <br /> • Fabs from elevations <br /> • Tripping over hoses, pipes, tools, or equipment <br /> • Slipping on wet or oily surfaces <br /> • Insufficient or faulty protective equipment <br /> • Insufficient or faulty operations, equipment, or tools <br />' Noise <br /> The SSO has the authority to suspend work anytime he/she determines the safety <br />' provisions set-forth in this SSP are inadequate to ensure worker safety. The SSD or <br /> Project Manager must be present during all phases of the site work. <br />' SSO Pager Number: f 5fo 1 . -716 ( 774 <br />' 7 1/18/95 <br /> I <br />