My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
125
>
2900 - Site Mitigation Program
>
PR0505562
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 3:03:36 PM
Creation date
2/14/2019 1:44:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505562
PE
2950
FACILITY_ID
FA0006864
FACILITY_NAME
CITY OF RIPON CORP YARD
STREET_NUMBER
125
Direction
E
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
RIPON
Zip
95366
CURRENT_STATUS
01
SITE_LOCATION
125 E CALIFORNIA ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 24 '95 05:16PM ANDERSON CONSULTING r Zi4 <br /> SI'Z'E SPECIFIC HEALTH AND SAFETY PLAN <br /> This plan must be completed prior to the initiation of field operations. All personnel associated with this <br /> project must be trained in handling hazardous materials per OSHA 29 CBR 1910.120 guidelines. All <br /> personnel performing field work for this project are to read this plan and sign it prior to beginning field work. <br /> A copy will be made accesible during the field operations. However, each organization is ultimately <br /> responsible for proper health and safety training for their employees. <br /> 1)PROJECT NAME: <br /> City of Ripon Corporation Yard <br /> 2)PROJECT LOCATION: <br /> 125 E.California Street <br /> Ripon,San Joaquin County,California <br /> 3)SrM DESCRIPTION= <br /> Active city corporation yard <br /> 4)PROJECT PERSONNEL: <br /> Project Engineer/Creologist'. Daniel Dottai <br /> Project Manager: Mark Thomas <br /> Project Director: John Baker,P.E. <br /> Technician: Ron Metcalf <br /> 5) REGULATORY OVERSIGHT AGENCY: <br /> San Joaquin County Environmental Health Division <br /> 6)PLANNED ONSITE ACTIVITIES: <br /> Assess environmental conditions of site(env.site assessment) <br /> Hand bore two soil borings to 15 feet each <br /> Coil=soil samples from borings <br /> Backfill borings with cement grout <br /> T)POTENTJAL PHYSICAL HAZARDS: <br /> Pctentialhazard Actions;to tell cP ha ands <br /> Drilling equipment Wear bardhats,steel-toed boots. <br /> Utilities USA not notified since hand angering within prior <br /> tank excavation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.