Laserfiche WebLink
N <br /> Soil Vapor Extraction Remediation Report - Third Quarter 2011 <br /> STALLWORTH AUTO SALES <br /> 602 North California Street, Stockton , California <br /> 1 .0 . INTRODUCTION AND SCOPE OF WORK <br /> At the request of Mr. Gary Stallworth of Stallworth Auto Sales, Advanced <br /> GeoEnvironmental , Inc. (AGE) has prepared this quarterly remediation reportfor 602 North <br /> California Street, Stockton , California (site) . This report documents operation and third <br /> quarter 2011 progress of a soil vapor extraction (SVE) recovery system at the site . <br /> Objectives of the site activities were to monitor the progress and effectiveness of SVE <br /> j remediation at the site . The site setting is illustrated on Figure 1 . Site structures and <br /> monitoring well locations are depicted on Figure 2 . Site background information is <br /> summarized in Appendix A. <br /> This report has been prepared in accordance with guidelines issued by the California <br /> Regional Water Quality Control Board (RWQCB ) - Central Valley Region for investigation <br /> of underground storage tank (UST) sites. <br /> 2 .0 . SOIL VAPOR EXTRACTION REMEDIATION SYSTEM <br /> Between 06 June 2011 and 22 August 2011 (third quarter 2011 ), an SVE remediation <br /> system was operated at the site, utilizing a natural gas-fired , catalytic oxidizer SVE system <br /> to apply an induced vacuum to wells VWA and VW-2 . On 22 August 2011 the on-site <br /> SVE system was temporarily shut down for the performance of an SVE rebound test. <br /> SVE procedures for the site were described in the AGE-prepared Interim Soil Remediation <br /> Work Plan (dated 25 July 2008) and approved by the San Joaquin County Environmental <br /> Health Department (SJCEHD) by letter dated 25 July 2008 . <br /> 2 . 1 , SOIL VAPOR EXTRACTION REMEDIATION SYSTEM PROCEDURES <br /> The SVE remediation system consists of a Solleco TCAT 250 catalytic oxidizer soil vapor <br /> extraction system . The SVE system utilized a manifold network of two-inch and three-inch <br /> diameter, Schedule 40 PVC piping installed belowground from SVE wells VW- 1 , VW-2 , <br /> VW-3 and VW-4 to an SVE moisture knockout vessel and 10-horsepower, maximum 250 <br /> standard cubic feet per minute (scfm) blower. <br /> In order to monitor efficiency of the SVE system : 1 ) a Magnehelic vacuum gauge and <br /> Dwyer DS-200 differential pressure sensor port were installed prior to the inlet (influent) of <br /> the SVE unit to monitor the soil vapor flow rate; 2) SVE vapor flow of the influent and <br /> effluent streams were monitored routinely for the presence of organic vapor using an <br /> organic vapor meter (OVM) equipped with a photo-ionization detector (PID : Thermo <br /> Advancer/ GeoEnvironmental, Inc. <br />