My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
602
>
3500 - Local Oversight Program
>
PR0544148
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 6:16:53 PM
Creation date
2/14/2019 2:56:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544148
PE
3526
FACILITY_ID
FA0005937
FACILITY_NAME
NEAL STALLWORTH AUTO DETAIL
STREET_NUMBER
602
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13916509
CURRENT_STATUS
02
SITE_LOCATION
602 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02 January 2009 <br /> AGE-NC Project No. 99-0682 <br /> Page 3 of 7 <br /> 2.3 , MONITORING WELL INSTALLATION <br /> AGE proposes to install one down-gradient, ground water monitoring well off-site (548 East Park <br /> Street), 140 feet northeast of the location of existing well MW- 10, as part of additional site <br /> assessment activities to define and confirm the lateral extent of contaminated ground water at the <br /> 70 feet bsg water-bearing zone . The location of the proposedmonitoring well (MW-12) is illustrated <br /> on Figure 2 , <br /> Following well installation, the well will be developed to maximize water flow and minimize the <br /> amount of fine-grained sediment drawn into the well duringpumping or bailing. Procedures for well <br /> completion and development are presented in Sections 3 .4 . and 3 .5 ., respectively. Additionally, the <br /> top of the well casing will also be surveyed by a licensed surveyor. <br /> Ground water monitoring and sampling of the newly installed ground water monitoring well will be <br /> conducted on a quarterly basis unless an alternate schedule or suspension of monitoring is approved <br /> bythe CVRWQCB . Ground water monitoring activities will include recording depth to groundwater <br /> measurements and collection of ground water samples; ground water sample collection procedures <br /> are described in Section 3 .6. Collected ground water samples will be analyzed by a CDPH-certified <br /> laboratory for the constituents listed in Section 2 .2 . <br /> 2.4 . REPORT PREPARATION <br /> Upon completion of field work and receipt of final laboratory analysis, a report will be prepared <br /> presenting findings of the investigation. The report will include a description of the workperformed <br /> and results of sampling and analysis . Conclusions, applicable recommendations, maps and <br /> cross-sections will be included in the report. The report will be in a format acceptable to the EHD <br /> and CVRWQCB, and will be reviewed and signed by a California Professional Geologist, <br /> 3 .0. FIELD PROCEDURES <br /> All field procedures will be overseen by anAGE representative under the supervision of a California <br /> Professional Geologist. Procedures for the advancement of the borings, ground water and soil <br /> sampling, monitoring well completion, equipment decontamination and sample shipment are <br /> outlined below. <br /> Advanced GeoEnvironmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.