Laserfiche WebLink
i <br /> Work Plan for Additional Assessment <br /> ARCO Facility No.2186 <br /> Stockton._California <br /> Page 3 <br /> only able locate one water well. Delta has been unable to reach a representative of the church at this <br /> time to gather further information regarding their well(s). <br /> Based on the information presented in the Oak Park West Well log(installation date and construction <br /> r details) the well is likely that which was previously identified in the survey conducted by Pinnacle. <br /> However, the location of the well is not the same. Oak Park West Well is located closer to the <br /> ARCO site and further to the west than reported in the Pinnacle survey. Based on the locations of the <br /> two wells in Oak Park, Delta is proposing to install two groundwater monitoring wells,between the <br /> ARCO site and each of the Oak Park wells. .Figure 2 presents the locations of the Oak Park wells and <br /> the proposed groundwater monitoring wells. <br /> SCOPE OF WORK <br /> The primary objectives associated with the proposed scope of work are: <br /> • Assess the extent of petroleum hydrocarbon impacted groundwater and evaluate possible <br /> offsite migration, <br /> + Evaluate the hydrocarbon impact of the first encountered groundwater, <br /> f <br /> • Evaluate the flow direction and gradient of the first encountered groundwater, arid <br /> • Identify an appropriate remediation alternative based the results of a feasibility study. <br /> To accomplish these objectives,the following activities are being proposed. <br /> • Install one groundwater monitoring well downgradient (northeast) of the site and install two <br /> monitoring wells offsite between the site and the two nearest water supply wells. <br /> • Collect soil and groundwater grab samples (via hydropunch) from the three soil borings for <br /> laboratory analyses. <br /> • Develop and sample the groundwater monitoring wells. <br /> • Sample groundwater in the shallow vapor extraction wells (VW-I through VW-3). <br /> • Survey the elevation and horizontal coordinates of the top of casing of each new monitoring <br /> well and the existing vapor extraction wells. <br /> • Conduct a 12 hour vapor extraction feasibility test using the existing vapor extraction wells. <br /> The scope of work has been subdivided into tasks 1 through 5. All geologic work will be under the <br /> direct supervision of a State of California .Registered Geologist and will be conducted in accordance <br /> with standards established by the Tri-Regional Board Guidelines for Hydrocarbon Site Assessment <br /> and Remediation (RWQCB 1991). Appendix B, Field Procedures and Practices and Appendix C, <br /> Sampling and Analysis Procedures present detailed procedures associated with the proposed <br /> activities. <br /> Task 1: Prefield Activities <br /> Following approval of the work plan by PHS/EHD,the following activities will be completed: <br /> • Prepare a Site-specific Health and Safety Plan, <br />