My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:25:00 AM
Creation date
2/15/2019 8:24:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. 1Q,39&i)hr.idz e:Iload ' <br /> wile 220 - <br /> ' Cameron Puck; CA 95682-900:1 <br /> H All, <br /> �.i Tel. 530.676.6884 <br /> aft'! .fi r 'e"til Rix.530.676.6385 <br /> the <br /> I <br /> 12roup HUM 19 AN. 10: 5 3 <br /> August 12, 1999 <br /> Project 791700 <br /> Carol Oz <br /> San Joaquin County <br /> Public Health Services <br /> Environmental Health Division <br /> 304 E. Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br /> Re: Underground Storage Tank•and Prodtict,Delivery Line Removal and Replacement <br /> for ARCO Products Company Facility No. 2186, Located at 3212 N. California <br /> Street, Stockton;California <br /> Dear Ms. Oz:, <br /> Pinnacle Environmental Solutions, a nierriber;.of The IT Group (Pinnacle) is pleased to <br /> provide thin report presenting the results;of.'.the,underground storage .tank (UST) and <br /> product delivery line removal conducted at''theFsubject site (see Figure 1).- Pinnacle <br /> provided removal oversight 'and collected confirmation soil samples. Services were <br /> consistent with the February 19, 1999 Overexcavation and Soil Sampling Workplan and <br /> the March 2, 1999'-Soil Overexcavation Addendum. The UST removal and replacement <br /> activities includedthe following: <br /> • UST and piping removal performed on:lune 17 and 24, 1999 <br /> UST compliance soil sample collection performed on lune 17, 1999 <br /> Piping trench compliance soil sample collection performed on June 17 and 24, <br /> 1999 <br /> • Soil stockpile sampling performed on June 21, 1999 <br /> • Installation of two 20;000-gallon UST9 and piping <br /> • Replacement of dispensers <br /> • Excavation backfilling conducted on June 21 through July 19, 1999 <br /> • Resurfacing of the former UST complex and piping trenches. <br /> CP1E:1ARC0121861REPORT512186P105.DOC-951sg:1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.