My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:16:46 AM
Creation date
2/15/2019 8:29:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> ARCO Sites <br /> Page 3 <br /> RBCA will be prepared for the site which may include a recommendation for closure. <br /> 3212 N California St, Stockton ARCO Facility #2186 <br /> PHS-EHD contact - Steven Sasson <br /> The lease at this site expires in one year. The fate of the tank system at the site will depend <br /> on whether the lease will be renewed at that time. The PIER was submitted and reviewed. <br /> During the meeting additional groundwater monitoring was discussed as the appropriate scope <br /> of work for the upcoming quarter. In addition to the three monitoring wells, VW-3 will be used <br /> as an additional groundwater monitoring well. All groundwater samples will be analyzed for <br /> MTBE in addition to TPH-g and BTEX. The next quarterly monitoring was scheduled for May. <br /> Summary <br /> The meeting allowed for continued communication between all parties and for continued progress at <br /> the sites. The next meeting to discuss the progress at ARCO sites in San Joaquin County is <br /> scheduled for Tuesday October 29, 1996 at 1:00 p.m. at the office of PHS-EHD. <br /> If you disagree with this summary or have any questions, please contact me at (209) 468-3449. <br /> Donna Heran, RENS, Director <br /> Environmental Health Division <br /> Margaret Lagorio, REHS <br /> Lead Senior, Site Mitigation Unit <br /> LT <br /> c: CVRWQCB, Beth Thayer <br /> C., EMCON, Jay Johnson <br /> c: Brown and Caldwell, Joel Coffman <br /> c: LOP Files <br />
The URL can be used to link to this page
Your browser does not support the video tag.