Laserfiche WebLink
Stantec <br /> Addendum to Work Plan for Vapor Probe Destruction, Well Destruction, and Well Installation <br /> ARCO Service Station No. 2186 <br /> January 26, 2009 <br /> Soil Vapor Probe Destruction <br /> Instead of pressure grouting to the total depth, the existing soil vapor probes (VP-1 through <br /> VP-3) will be over-drilled to the total depth and will be grouted from the total depth to the ground <br /> surface using neat cement via a tremie pipe. <br /> The over-drilling of soil vapor probes VP-1 through VP-3 will be supervised by Stratus. A <br /> licensed drilling company will complete the soil vapor probe destruction work following the <br /> California Well Standards bulletin 74-90 Part 111, Section 19 and 23. <br /> Installation of Two Shallow Wells <br /> Two on-site soil groundwater monitoring wells .(MW-1 R and MW-3R) screened across the <br /> shallow groundwater bearing zone are proposed to be installed at the approximate locations <br /> shown on Figure 1. The proposed. well locations-may change in the field due to unexpected site <br /> conditions such as a hard pan layer or Imitations in equipmentnt placement;'etc. <br /> Prior to drilling, the soil borings will be air-knifed to at least five ft bgs. The soil borings for <br /> MW-1 R and MW-3R will be advanced to approximately 58 ft.bgs, instead-of_55 ft bgs, using a <br /> drill rig equipped with eight-inch diameter, continuous flight, hollow-stem augers.- <br /> The <br /> ugers:The hollow-stem auger will be advanced to_30.ft_bgs, during which continuous coring will begin <br /> I <br /> -.r� � x - - �_ -and endo the total boring depth. An attending geologistwill fog_cuttinds'_rid sample-in <br /> accordance with American Society for Testing and Materials {ASTM)'`D-2488 Standard <br /> Practice for Description and Identification of Soils (Visual-Manual Procedure) under the direction <br /> of a State of California Professional Geologist or Professional Engineer. Soil cores will be <br /> screened in the field for the presence of volatile organic compounds,using.a-photo-ionization• <br /> detector.(PID):-;All down-hole drilling equipment will be decontaminated with high pressure <br /> steam following -the—completion of each soil boring. Down-hole sampling equipment will be <br /> decontaminated between samples using an Alconox detergent solution and a tap water rinse. <br /> The shallow wells will be constructed of two-inch.diameter,.*flush-treaded, schedule 40 .poly <br /> vinyl chloride-(PVC.) well casing with,20 ft of 0.020-inch.factoryyslo ed well screen set at depths <br /> of 38 to 58 ft-bgs,' instead of 35-to 55 ft bgs.`-A sand filter pac will be placed in the annular i <br /> space surrounding the entire screened interval, and will extend approxi mately one.to=two ft ! <br /> above the screen interval. A two to three-foot thick _bentonite annular seal will be'placed above <br /> the filter pack-and will.be�h.ydrated., The'-remainder of'the`annular space will be filled with neat I <br /> cement and/or grout from the top of the bentonite seal to within 12 inches ofAhe_-surface. The <br /> well will be secured wit ."lock ing7well cap'`and c pie d with aterfight traffic-rated welllf <br /> box installed at grade. A detail of the well completion is presented in Figure 2.—_JA .5wff 0 a <br /> Installation of One Deep Well <br /> One on-site soil groundwater monitoring well (MW-1D) screened across the deep groundwater <br /> bearing zone is proposed to be installed at the approximate location shown on Figure 1. The <br /> proposed well location may change in the field due to unexpected site conditions such as a hard <br /> pan layer or limitations in equipment placement, etc. <br /> J <br /> Prior to drilling, the soil boring will be air-knifed to at least five ft bgs. The soil boring for MW-1 D <br /> will initially be advanced to approximately 65 ft bgs using a drill rig equipped with an eight-inch <br /> diameter, continuous flight, hollow-stem auger as a pilot hole. Afterward, the soil boring will be _ <br /> 2186 Addendum to Work Plan for Vapor Probe Destruction, Well Destruction, and Well Installation.doc 2 <br />