My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000837
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
ARCHIVED REPORTS XR0000837
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 10:29:00 AM
Creation date
2/15/2019 9:43:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000837
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
yl <br /> r <br /> Date September 19, 2000 <br /> ARCO QUARTERLY GROUNDWA�TENITORING REPORT <br /> �l <br /> Facility No 02186 Address 3212 North California Street, Stockton, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person Delta Environmental Consultants, Inc /Jay R Johnson <br /> Consultant Project No D000-330-1 <br /> Primary Agency/Regulatory ID No Carol Oz, San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (Second 2000) <br /> 1 Groundwater samples were collected and submitted for laboratory analysis from monitoring wells <br /> MW-1 through MW-4 and vapor well VW-3 Analysis included oxygenates by USEPA Method 8260 <br /> 2 Delta compiled and evaluated the groundwater monitoring data <br /> WORK PROPOSED FOR NEXT QUARTER (Third 2000) <br /> 1 Delta will continue to perform quarterly groundwater monitoring The next sampling event is tentatively <br /> scheduled for September 2000 Groundwater samples from wells MW-1 through MW-4 and vapor <br /> wells VW-1 through VW-3 will be collected and analyzed for total petroleum hydrocarbons as gasoline <br /> (TPHG) using U S Environmental Protection Agency (USEPA) Method 8015 Modified, for benzene, <br /> toluene, ethylbenzene, and total xylenes (BTEX), and methyl tert-butyl ether(MTBE) using USEPA <br /> Method 8020, and for oxygenates Including tert-butyl-alcohol, MTBE, dl-isopropyl ether, ethyl tertiary <br /> butyl ether, and tertiary amyl methyl ether using USEPA Method 8260 <br /> 2 Delta will submit a workplan for additional site assessment and feasibility testing <br /> 3 The soil vapor extraction test is scheduled to be conducted in September <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling MW-1 through MW-4, and VW-3=Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Sample Date June 22, 2000 <br /> Is Free Product(FP) Present on Site No <br /> FP Recovered this Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 34 37 to 36 08 <br /> Direction of Groundwater Flow East <br /> Groundwater Gradient 0 0027 ft/ft <br /> C IARC012l861QTRLY1200012186Q200 doc Delta <br /> 09 I WI) <br />
The URL can be used to link to this page
Your browser does not support the video tag.