My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012820
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
ARCHIVED REPORTS XR0012820
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 10:48:04 AM
Creation date
2/15/2019 9:53:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012820
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g�QOW <br /> 1433 North Market Boulevard . Sacramento California 95634-1943 • (916)928-3300 • Fox(916)928-3341 <br /> AUG 7 1995 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> SITE HEALTH AND SAFETY PLAN SITE SAFETY PLAN NO. 0805- <br /> 147.01 <br /> SUBSURFACE ENVIRONMENTAL INVESTIGATION <br /> at the <br /> ARCO Service Station No 2186 <br /> 3212 California Street <br /> Stockton, California <br /> (May 31, 1995) <br /> Introduction <br /> . This Site Safety Plan describes basic safety requirements for the subsurface environmental <br /> investigation The provisions set forth in this Plan apply to the employees of EMCON and <br /> its subcontractors working on this phase of the protect The subcontractors may elect to <br /> modify these provisions, but only to upgrade or increase the safety requirements, and only <br /> with the concurrence of EMCON, as designated and accepted in writing <br /> This Site Safety Plan will address the expected potential hazards that may be encountered <br /> on the worksite for this protect Field activities are planned to begin on August 16, 1995, <br /> with the duration estimated at approximately 1 year after the start date If changes in site <br /> or working conditions occur as activities progress, addenda to this plan will be provided <br /> by EMCON <br /> Authority for Site Safety <br /> The EMCON personnel responsible for project safety are the Project Manager and the <br /> Staff Geologist or Engineer The Health and Safety Coordinator is responsible for the <br /> overall EMCON's Health and Safety Program and may choose to audit the site for <br /> compliance and take appropriate action to correct deficiencies The Project Manager is <br /> responsible for implementing the provisions of this Plan, for providing a copy of this Plan <br /> to the Staff Geologist or Engineer, and for advising the Staff Geologist or Engineer on <br /> • health and safety matters The Project Manager and Staff Geologist or Engineer have the <br /> authority to audit site activities for compliance with the provisions of flus Plan They may <br /> SAC%N1PJ0108051080514701AN-941dms 1 B-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.