Laserfiche WebLink
g�QOW <br /> 1433 North Market Boulevard . Sacramento California 95634-1943 • (916)928-3300 • Fox(916)928-3341 <br /> AUG 7 1995 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> SITE HEALTH AND SAFETY PLAN SITE SAFETY PLAN NO. 0805- <br /> 147.01 <br /> SUBSURFACE ENVIRONMENTAL INVESTIGATION <br /> at the <br /> ARCO Service Station No 2186 <br /> 3212 California Street <br /> Stockton, California <br /> (May 31, 1995) <br /> Introduction <br /> . This Site Safety Plan describes basic safety requirements for the subsurface environmental <br /> investigation The provisions set forth in this Plan apply to the employees of EMCON and <br /> its subcontractors working on this phase of the protect The subcontractors may elect to <br /> modify these provisions, but only to upgrade or increase the safety requirements, and only <br /> with the concurrence of EMCON, as designated and accepted in writing <br /> This Site Safety Plan will address the expected potential hazards that may be encountered <br /> on the worksite for this protect Field activities are planned to begin on August 16, 1995, <br /> with the duration estimated at approximately 1 year after the start date If changes in site <br /> or working conditions occur as activities progress, addenda to this plan will be provided <br /> by EMCON <br /> Authority for Site Safety <br /> The EMCON personnel responsible for project safety are the Project Manager and the <br /> Staff Geologist or Engineer The Health and Safety Coordinator is responsible for the <br /> overall EMCON's Health and Safety Program and may choose to audit the site for <br /> compliance and take appropriate action to correct deficiencies The Project Manager is <br /> responsible for implementing the provisions of this Plan, for providing a copy of this Plan <br /> to the Staff Geologist or Engineer, and for advising the Staff Geologist or Engineer on <br /> • health and safety matters The Project Manager and Staff Geologist or Engineer have the <br /> authority to audit site activities for compliance with the provisions of flus Plan They may <br /> SAC%N1PJ0108051080514701AN-941dms 1 B-1 <br />