My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1800
>
2900 - Site Mitigation Program
>
PR0010361
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 11:02:30 AM
Creation date
2/15/2019 10:32:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0010361
PE
2951
FACILITY_ID
FA0003761
FACILITY_NAME
ST JOSEPHS HOSPITAL
STREET_NUMBER
1800
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12718044
CURRENT_STATUS
02
SITE_LOCATION
1800 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> _ I!I <br /> Working to Restore Nature <br /> ki <br /> II <br /> 1710 Main StreetD s y <br /> Escalon,CA 95320 u o <br /> Phone:(209)838-3507 I <br /> FAX:(209)838-3509 I <br /> APR 2 31992 <br /> �F April 22 , 1992 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SEI''VICES <br /> 1 Ms. Tish Resch k <br /> P.O. Box 2009 ° f <br /> Stockton, CA 95201 i <br /> f <br /> RE: Amendment to the Tank Closurel'i�Permit Application # 39- <br /> 1036-02, for St. Joseph's Medical Center, 1800 California <br /> St. , Stockton, Ca <br /> i <br /> h <br /> Dear Ms. Resch; f <br /> This application amends closure permit #39-1036-02 for the above <br /> referenced site. <br /> Upon removal of the tank several problems were encountered which <br /> prevented completion of soil sampling asll� outlined in the original <br /> } tank closure permit application. First, an cement slab was <br /> discovered beneath the tank and second, the tank pit was filled <br /> with pea gravel. Both of these situations prevented the collection <br /> of soil samples from beneath the tank utilizing a backhoe bucket, <br /> as originally planned. <br /> To complete the tank closure, RESNA InduE tries amends the original <br /> 11 <br /> sampling plan, as outlined in San Joaquin County Tank Removal <br /> Guidelines, as follows: <br /> i <br /> • Drill utilizing a State licensed C-57 drill rig, one soil <br /> boring through the center of the cement slab, and drill four <br /> soil borings around the perimeter of the cement slab, <br /> t collecting samples for laboratory 1ianalysis with a modified <br /> California split-spoon sampler. <br /> s � <br /> l <br /> II� <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.