My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 2:21:21 PM
Creation date
2/15/2019 1:30:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
groundwater should be supported by laboratory data at approved detection limits and <br /> QA/QC. <br /> ConocoPhillips anticipates that the well proposed in SECOR's Workplan dated April 7, 2003 <br /> will complete the lateral and vertical delineation of the petroleum hydrocarbon plume at the <br /> site. Once the data is received and verified from this well installation, SECOR will submit a <br /> Site Conceptual Model. <br /> The Corrective Action Plan (CAP) that includes a Feasibility Study should be <br /> submitted to EHD that evaluates at least two remedial alternatives that could return <br /> groundwater to 'pre-release' conditions. The CAP should include the 'chosen' <br /> alternative that your consultant has determined to be the most cost-effective and <br /> feasible for site-specific conditions. <br /> The CAP will include the evaluation of at least two remedial alternatives for site cleanup. <br /> Previously ConocoPhillips performed a DPE feasibility test at the site. <br /> After the CAP is approved by EHD, you will be required to submit the Remedial Action <br /> Plan (RAP) that includes a detailed material list, a cost and time estimate, and a <br /> construction schedule to implement the remedial action. EHD will evaluate the RAP, <br /> comment as needed, or approve the plan as submitted. <br /> Following CAP approval, a RAP will be submitted as requested above. <br /> Given the uncertainties of the time required for obtaining City Encroachment permits (for well <br /> installation) and obtaining site access to the Lathrop Grammar School, the following schedule <br /> is proposed. <br /> Action Submittal Date <br /> Well Installation Report 45 days after drilling <br /> Site Conceptual Model 60 days after Well Install Report <br /> CAP 60 days after SCM approval <br /> RAP 45 days after CAP approval <br /> Additionally, I would like the opportunity to meet with you to discuss future activities at our <br /> sites. Please feel free to contact me at (916) 558 - 7633, if you have questions or need <br /> additional information. <br /> Sincerely, <br /> Edward C. Ralston <br /> Site Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.