Laserfiche WebLink
'Wo� S E C O R <br /> September 7, 2004— Work Plan for Well Installation and Vertical Assessment <br /> THIS QUARTER ACTIVITIES (Third Quarter 2004) <br /> 1. Performed quarterly groundwater monitoring and sampling (TRC). <br /> 2. Prepared and submitted a quarterly summary report. <br /> 3. Performed offsite geoprobe assessment and submitted report. <br /> 4. Submitted work plan for well installation and vertical assessment. <br /> NEXT QUARTER ACTIVITIES (Fourth Quarter 2004) <br /> 1. Prepare and submit a quarterly summary report. <br /> 2. Perform quarterly groundwater monitoring and sampling. <br /> 3. Perform well installation and vertical assessment and submit results in a Site Conceptual <br /> Model. <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> Based on the third quarter groundwater monitoring and sampling and data TPPH, benzene, and <br /> MtBE are fully delineated with the exception of northeast of well MW-16. SECOR has submitted <br /> a work plan for the installation of additional wells downgradient of MW-16 that should complete <br /> delineation. Upon the completion of work outlined in Work Plan for Well Installation and Vertical <br /> Assessment dated September 7, 2004 and submission of the results in an SCM, interim remedial <br /> options should be implemented to prevent additional offsite migration of petroleum hydrocarbons. <br />