Laserfiche WebLink
I <br /> f <br /> �MW-12Y23 MWGO WAY ..— o MW-14 <br /> MW_ <br /> I <br /> I � <br /> I <br /> I <br /> I USD c Z <br /> � � m <br /> MW-24� W-25 SV-5 <br /> I ®SV-6 <br /> T j SP-14 <br /> j PORTION OF REMEDIAL <br /> M BE EXPANDED <br /> UPON S <br /> UPON UCCESSFULL COMPLETION <br /> OFPILOTTEST. <br /> I <br /> SP-13 <br /> I � � <br /> I i G <br /> sv �.._.._.._..♦sP-10 �� <br /> S"Ti,-! <br /> Y AMW-6 ® A <br /> SV-3 W-15 <br /> Ac SP-9. <br /> PAVING <br /> I i \ <br /> BUILDING \ <br /> 1 I <br /> A `I + 1 VE< SP-7T i PORTION OF REMEDIAL <br /> m _ SYSYTEM PROPOSED FOR <br /> USE IN PILOT TEST <br /> MW-2 \ SP-6 MW-7,-L—, <br /> M WO ! SV-2 REMEMAL <br /> .VE-3 1 I VE-2 CONC EV TIER COMPOUND <br /> MW-2 <br /> r W-1 _ <br /> �SO j nc <br /> )SP-5 /^� \� D <br /> AD l \ \\\ \ j BUILDING/� <br /> PAVJI <br /> b Mw a= sv-1 <br /> VE 11 W-3 <br /> �SP-2 <br /> �R SP-1 <br /> DRIVEWAY <br /> LEGEND: .. —.. —. —w —w —.„ <br /> 'AfI �� <br /> 'f C <br /> LOUISEAVENUE <br /> �MW-1 GROUNDWATER MONITORING WELL "1 <br /> SP-4 OZONE SPARGE WELL �/a2 f S <br /> MW-24'to PROPOSED GROUINDWATER MONITORING WELL 3 N <br /> -� PROPOSED OZONE SPARGE WELL <br /> - 3 PROPOSED SVE WELL–v6'I-"t 3 <br /> O PROPOSED SOIL GAS PROBE 7 <br /> O PULL BOX <br /> —••–•--••— REMEDIAL TRENCHING(FIRST PHASE) <br /> —'•–••- - REMEDIAL TRENCHING(SECOND PHASE) <br /> 0 40 80 <br /> STORM DRAIN PIPING <br /> WATER MAIN PIPING APPROXIMATE SCALE(FEET) <br /> .� MANHOLE COVER f L FOR: FIGURE: <br /> STORM DRAIN CONOCOPHIWPS SITE PLAN WITH PROPOSED SOIL <br /> CIRCLE K STATION NO.1205 ^ <br /> REFERENCE: 16470 CAMBRIDGE DRIVE VAPOR SAMPLING POINTS AND 2 <br /> THE UTILITY LOCATIONS ARE BASED ON A4IDUIY MAP' .7' LATHROP,CALIFORNIA GROUNDWATER MONITORING WFI I c <br />