My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 2:31:10 PM
Creation date
2/15/2019 1:45:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM ORDER NO. R5-2008-0149-010 5 <br /> CONOCOPHILLIPS <br /> SAN JOAQUIN COUNTY <br /> An ozone detection meter (field test instrument) will be continuously monitoring the <br /> breathing zones inside the remediation equipment area and at each injection wellhead <br /> during maintenance and monitoring field activities. Field test instruments (such as those <br /> used to test pH and dissolved oxygen) may be used provided that: <br /> 1. The operator is trained in proper use and maintenance of the instruments; <br /> 2. The instruments are calibrated prior to each monitoring event; <br /> 3. Instruments are serviced and/or calibrated by the manufacturer at the recommended <br /> frequency; and <br /> 4. Field calibration reports are submitted as described in item (b) of the 'Reporting" section <br /> of this MRP. <br /> DISCHARGE MONITORING <br /> 4. The Discharger shall monitor the amendments that are injected into the groundwater <br /> according to the requirements specified in Table 4. Each amendment addition shall be <br /> recorded individually, along with information regarding the time period over which the <br /> amendment was injected into the aquifer. Periods when the ozone treatment system is <br /> inoperative shall be noted with dates and times in the monitoring report. <br /> Table 4: Discharge Monitoring Requirements <br /> Parameters Units Type of Sample <br /> Ozone Gas Injected grams per day Measured <br /> Biocide Added grams per day Measured <br /> REPORTING <br /> 5. When reporting the data, the Discharger shall arrange the information in tabular form so that <br /> the date, the constituents, and the concentrations are readily discernible. The data shall be <br /> summarized in such a manner as to illustrate clearly the compliance with this Order. In <br /> addition, the Discharger shall notify the Regional Board within 48 hours of any unscheduled <br /> shutdown of any soil vapor and/or groundwater extraction system. The results of any <br /> monitoring done more frequently than required at the locations specified in the Monitoring <br /> and Reporting Program shall also be reported to the Regional Board. <br /> 6. As required by the California Business and Professions Code Sections 6735, 7835, and <br /> 7835.1, all reports shall be prepared by a registered professional or their subordinate and <br /> signed by the registered professional. <br /> 7. The Discharger shall submit quarterly electronic data reports, which conform to the <br /> requirements of the California Code of Regulations, Title 23, Division 3, Chapter 30. The <br /> quarterly reports shall be submitted electronically over the internet to the Geotracker <br /> database system by the 30th day of the month following the end of each calendar quarter, <br /> 30 April,30 July, 30 October, and 30 January, until such time as site conditions and <br /> Regional Board staff determine that modification to the reporting requirements are <br />
The URL can be used to link to this page
Your browser does not support the video tag.