Laserfiche WebLink
FED <br /> APR 0 9 2010 <br /> Stantec Consulting Corporation <br /> Rancho <br /> Kilgore Road Suite 100 <br /> Rancho Cordovad Site 10 ENVIRONMENT HEALTH <br /> Tel:(916)861-0400 PERMIT/SERVICES <br /> Fax:(916)861-0430 <br /> April 7, 2010 <br /> Attention: Mr. James Barton, P.G. <br /> California Regional Water Quality Control Board, Central Valley Region <br /> 11020 Sun Center Drive, Suite 200 <br /> Sacramento, California 95670 <br /> RE: Response to Notice of Intent Comments <br /> Circle K Store No. 1205 <br /> 16470 Cambridge Drive <br /> Lathrop, California 95330 <br /> Stantec Project No.: 211402553 <br /> Dear Mr. Barton: <br /> On behalf of ConocoPhillips Company (ConocoPhillips), Stantec Consulting Corporation <br /> (Stantec) is submitting this letter in response to the comments received from the California <br /> Regional Water Quality Control Board - Central Valley Region (RWQCB) in a letter dated March <br /> 3, 2010 (Attachment A) regarding the Notice of Intent (NOI) application package submitted by <br /> Stantec on February 26, 2010. An NOI application package was submitted to comply with the <br /> RWQCB General Waste Discharge Requirements Order No. R5-2008-0149 for in-situ <br /> groundwater remediation using an ozone sparge (OS) and soil vapor extraction (SVE) system at <br /> the above-referenced site. The comments are as follows with Stantec's subsequent underlined <br /> responses: <br /> 1) The NOI states CEQA has been conducted by San Joaquin County Environmental Health <br /> Department. This is incorrect, as the NOI referenced a Notice of Responsibility, which is not <br /> a CEQA determination. A blank Initial Study and instructions were provided electronically to <br /> your consultant on 2 March 2010. The Initial Study for your project is necessary for <br /> comparison to the R5-2008-0149 Initial Study for CEQA, to determine whether this general <br /> order is appropriate. <br /> • The Initial Studv for the project is included as Attachment B. <br /> 2) The draft information (fact) sheet needs to include a due date (48 days after the mailing <br /> date)for submitting public participation comments to me, and; <br /> • A revised draft fact sheet is included as Attachment C. An electronic version on CD- <br /> ROM is also being submitted with this response letter. <br /> 3) The list of interested parties needs to be expanded to include all owners, tenants, street <br /> addresses and parcel numbers of properties located within 200' of the groundwater plume, <br /> which, as of September 2009, exists over 400' offsite under the residential neighborhood. <br /> 1205 Response letter.doc 1 <br />