Laserfiche WebLink
r <br /> San Joaquin County <br /> r oP` "" Environmental Health Department DIRECTOR <br /> Donna Heran, REHS <br /> 600 East Main Street <br /> C Stockton California 95202-3029 PROGRAM COORDINATORS <br /> � Robert McClellon,REHS <br /> - - — Jeff Carruesco,REHS,RDI <br /> Website: www.sjgov.org/ehd Kasey Foley, REHS <br /> 4 v o R d <br /> Phone: (209) 468-3420 Linda Turkatte,REHS <br /> Fax: (209) 464-0138 <br /> January 23, 2012 <br /> Mr. Eric Hetrick Hardev & Amarjit Khinda Etal <br /> ConocoPhillips 27000 S. Leeward <br /> 76 Broadway Tracy, CA 95304 <br /> Sacramento, CA 95812 <br /> Subject: Circle K / Service Station #01205 RO#: 0138 <br /> 16470 Cambridge Drive AP#: 196-430-32 <br /> Lathrop, CA 95330 Global ID#: T0607700822 <br /> The San Joaquin County Environmental Health Department (EHD) has reviewed Revised <br /> Work Plan for Well Abandonment and Replacement, (Plan) dated January 3, 2012 that <br /> was submitted by Blaes Environmental Management, Inc. <br /> The Plan was submitted in response to the EHD's requirement to replace monitoring wells <br /> MW-1 and MW-2 that were damaged during the underground storage tank (UST) removal <br /> December 20, 2011. In addition, unstable and crumbling UST excavation dirt walls did not <br /> allow for the safe collection of required soils samples below the USTs. The Plan includes <br /> a proposal to collect the three required sidewall soil samples to complete the UST removal <br /> procedures and also provides for the removal of damaged MW-1 and MW-2 and the <br /> installation of replacement monitoring wells, MW-1 R and MW-2R. <br /> The Plan proposes drilling out and removing damaged monitoring wells MW-1 and MW- <br /> and replacing them by installing MW-1R and MW-2R in close proximity to each. Since <br /> these two new wells will be in the area soil samples are required to complete the UST <br /> removal plan, the Plan proposes that two initial monitoring well boreholes will be sampled <br /> at 9' (feet), 14', and 25' below ground surface (bgs) before proceeding to construct MW- <br /> 1R and MW-2R. The EHD UST-Unit III has advised that only a 14.5' to 15.0' bgs soil <br /> sample is required. The EHD Unit IV remediation unit (LOP) concurs. <br /> After two of the UST soil samples have been collected, one additional soil boring will be <br /> advanced along the northern edge of the former UST excavation to collect the last <br /> required soil sample. No monitoring well is proposed to be installed in this hole. Please <br /> ensure that the soil sample from this northern UST boring is collected from 14.5' to 15.0' <br /> bgs also. <br /> The procedures included in the Plan for the well destructions, new well installations, and <br /> soil sampling procedures are adequate and necessary and approved. [Health and Safety <br /> Code, 25296.10(c)(3)] <br />