S (EC ® R <br /> ATTACHMENT A <br /> FIELD PROCEDURES <br /> Exploratory Drilling <br /> Vertical delineation soil borings will be advanced using narrow diameter, direct push technology to <br /> approximately 70 feet below ground surface. Borings will be logged by a SECOR International <br /> Incorporated geologist using the Unified Soil Classification System and standard geologic techniques. Soil <br /> samples for logging will be collected continuously. All soil samples for chemical analysis will be retained in <br /> t <br /> acetate tubing, capped with Teflon squares and plastic end caps, and sealed in clean zip-lock bags. �- <br /> Groundwater samples will be collected using a hydropunch sampler and clean dedicated acetate tubing n <br /> attached to a peristaltic pump. The samples will be placed on ice for transport to the laboratory <br /> accompanied by chain-of-custody documentation. All down-hole drilling and sampling equipment will be "z <br /> steam-cleaned following the completion of the soil boring. Down-hole sampling equipment will be washed <br /> in a tri-sodium phosphate or alconox solution between samples. ty <br /> Wells will be installed using 8-inch hollow-stem auger drilling equipment. No soil samples will be colleted. <br /> All down-hole drilling and sampling equipment will be steam-cleaned prior to and following the completion :m <br /> • of the soil borings. Down-hole sampling equipment will be washed in a trisodium phosphate or alconox <br /> ( ;. <br /> solution between samples. � <br /> "LLQ <br /> Groundwater Monitoring Well Installation and Development <br /> The groundwater monitor well will be completed by installing a 2-inch diameter, flush-threaded, <br /> schedule 40 PVC casing with 0.020-inch factory-slotted screens. Approximately 15 feet of screen will be <br /> used to construct the monitor wells. A #3 sand pack, or equivalent, will be placed in the annular space <br /> across the entire screened interval, extending approximately 2-feet above the top of the screen. A 2-foot <br /> bentonite transition seal will be placed atop the sand pack, followed by a neat cement seal, extending from <br /> the top of the bentonite transition seal to the ground surface. The boring logs will show well construction , <br /> details. <br /> The development procedure for each well consists of swabbing the screen interval and pumping or bailing s <br /> approximately ten casing volumes of water from the wells. The well development sheets will be included <br /> in the assessment report. <br /> Soil Cuttings and Purge Water <br /> Soil cuttings generated during drilling operations will be stored onsite in 55-gallon drums onsite pending <br /> characterization. Water generated during equipment cleaning will be stored in 55-gallon drums onsite <br /> pending characterization. The soil and water will be removed from the site by a licensed disposal <br /> contractor and transported to an appropriate disposal or treatment facility for proper disposal <br /> V <br /> ,V <br /> �v <br />