Laserfiche WebLink
' CLEA\UP AND ABATEMENT ORDER NO 5.00-704 4 <br /> FORMER CHEVRON STATION #9-5775 <br /> r301 WEST KETTLEMAN LANE <br /> 0-10131. S 4N JOAQUIN COUNTY <br /> r Site-Specific lin estigation and Cleanup Tasks (continued) <br /> Compliance Date <br /> 3 Install and continuously operate a soil vapor extraction system, and an 3 July 2000 <br /> interim pump and treat system in the area of the highest soil and <br /> groundwater M(BE contamination The interum pump and treat <br /> ' s)stem must stabilize the groundwater plume to pre-*ent movement <br /> of 114tBE ton and City Well 12. <br /> ' 4 Submit a complete Problem Assessment Report (PAR) acceptable to the 24 July 2000 <br /> Board and County staff, as described in Appendix A of the Tri-Regional <br /> Recommendations The PAR must include requirements for any <br /> discharge permit(s) required and a time line for submittal of Report(s) of <br /> Waste Discharge <br /> ' 5 Within 15�days of Board staff approval of the Problem Assessment 28 August 2000 <br /> Report, but no later than 28 August 2000, submit a Final Remediation <br /> Plan (desenbed in Appendix A) for the cleanup of the soil and <br /> groundwater at the site <br /> ' 6 Within 30 days of Board staff approval of the selected Remedial Option, 6 October 2000 <br /> but no later than 6 October 2000,implement and continuously operate, <br /> the approved remediation system,with the exception of periodic and <br /> scheduled maintenance. Any interruption in the operation of the <br /> cleanup system(s),other than for scheduled maintenance,without prior <br /> approval of the Executive Officer, is a violation of this Order <br /> 4 <br /> Reporting and Permits <br /> ' 7. ?notify the Board and County staff at least two business days prior to any site work or sampling <br /> S Obtain all necessary local and state permits prior to beginning work- <br /> 9 Submit all reports and correspondence to the Board's Sacramento Office, the San Joaquin <br /> County Environmental Health Division, and all parties (or representatives) identified in this <br /> Order. Under penalty of perjury, the technical reports as directed,which shall be submitted to the <br /> Executive Officer of the Board,and to the County,must be signed by an appropriately licensed <br /> professional(technical reports and plans, including drilling logs and soil and groundwater <br /> sampling, are to be prepared, signed, and certified by a Registered Geologist, Registered Civil <br /> Engineer, Certified Engineering Geologist, or Certified Hydrogeologist) All registered <br /> professionals must be licensed by the State of Califowa <br /> 10 Submit preapprovals with workplan and all reports with reimbursement requests to the State <br /> Water Resources Control Board Cleanup Fund m a timely manner to avoid delays that would <br /> result in non-compliance with this Order <br />