My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000768
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
ARCHIVED REPORTS XR0000768
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 4:29:45 PM
Creation date
2/15/2019 2:04:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000768
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD SERVICES REQUEST <br /> SITE INF <br /> ORMATION FORM <br /> Identification Protect Type Check Appropriate Category <br /> Project # 77CP 61205 05 0001 Operation & Maintenance ❑X Budget Site Visit <br /> Station ID# Tosco 1205 ❑ Sampling Out of Budget Site Visit <br /> Site Address 16470 Cambridge St 1 st Time Visit <br /> Lathrop, CA Quarterly Budget Hours <br /> Lab WA 1st _2nd 3rd 4th Actual Hours <br /> County San Joaquin Monthly Mob/de Mob <br /> Project Manager CllntHarms Semi-Monthly <br /> Requester KrlssyFlesoras Weekly Site Safety Concerns <br /> Client ConocoPhllllps One Time Event <br /> Client P O C Ed Ralston Other <br /> Date of Request 10/03/03 Field Date 10/6/2003& 10/10/03 <br /> Field Tasks General Description <br /> DAY 1 -10/6/03 <br /> (1) Clear memory in each data logger prior to installation Connect logger to Palm communication port BE SURE NOT TO <br /> HOT-SYNC THE PALM PILOT'll Global Water said that this has resulted in the malfunction of the logger programming and <br /> recordingl To do this, click on "Clear Memory" It will ask if you are sure,then click"yes" <br /> }Id])S t5 Irl 441t, pK)gt'Uw Witley ri roomer ri e <br /> (2) Measure depth to water in each well prior to installing loggers in wells MW-11 through MW-irh%d MW-16 Record on <br /> 110ttached field sheet <br /> (3) Average depth to water in the wells is approximately 1 V bgs Install each logger In the wells above at least 5 feet below <br /> measured depth to water Make sure you are well clear of the well depth Secure logger at the desired depth, you will <br /> have to stuff the excess cable in the well <br /> (4) Use Palin Pilot to get a reading of the height of the water column by clicking on "Get History" Use this value to <br /> calculate depth at which the logger was installed(Depth to water-height of the measured water column) Loggers <br /> have been set to record at 10-minute intervals <br /> (5) Make sure wells are secure before leaving the site You may want to check the loggers to make sure they are recording <br /> properly You can do this by again,clicking on "Get History" <br /> DAY 2-10110/03 <br /> (6) Remove the pressure transducers/data loggers from the wells Decontaminate each data logger before returning to <br /> the office <br /> Comments/Remarks from Field Staff <br /> Completed By /�-. - Date m4-t-3 SECOR <br /> lnlernaeanal Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.