Laserfiche WebLink
■ <br /> SVE/GWE SYSTEM <br /> . FIELD MONITORING DATA SHEETS <br /> Date Time of Arrival '/-5 <br /> Technician Steve Thompson Time of Departure c <br /> Site Engineer Bob Jackson Time Site Engineer was contacted from field's " d <br /> PART A GENERAL INFORMATION <br /> Site Location Chevron 9-5775-301 West Kettleman Lane Lodi,CA Project No 77CH 95775 00 0550 <br /> Abatement Equip Falmouth Products Falco 100 Catalytic Oxidizer Serial No <br /> SVE Blower 5-hp 5-hpmotor, 15 5 Amp AMP Reading �S <br /> Telemetry Sonitrol MAX AMP Rating <br /> Electrical Power 230 V 3 phase—200 amp <br /> Elect Meter Pleading ,�4g 71�� <br /> Supplemental Fuel None <br /> No of K/O barrels at site Full ` �n�' Empty <br /> PART B SVE SYSTEM DATA <br /> System up or down upon arrival v (If down please complete PART E) <br /> Hourmeter Reading At time 1 ° 1 3 <br /> A Previous hourmeter reading 11296,6-- <br /> 2- <br /> B <br /> 9295+6--2B Current hourmeter reading <br /> C Current reading minus previous reading <br /> D Total hours since fast ORM event _ <br /> E C/D X 100 %Operability <br /> �1 1 <br /> Reportpercent operabrWy to site engtneer prior o leavwg sue <br />