Laserfiche WebLink
SVEIGWE SYSTEM <br /> • FIELD MONITORING DATA SHEETS <br /> Date Time of Arrival <br /> Technician Gf/'�C� Time of Departure <br /> Site Eng(neer G /1 Was Site Engineer contacted from field? Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location Chevron 9 5775 301 West Kettleman Lane Lodi CA Project No 77CH 43452 00 0550 <br /> Abatement Equip Falmouth Products Falco 100 Catalytic Oxidizer Serial No C <br /> SVE Blower 5 hp motor, 15 5 Amp. l Max AMP Rating f�J <br /> Telemetry O h r /'t�/ MAX AMP Bating <br /> Electrical Power 230 V 3 phase—200 am <br /> Elect Meter Reading —7Gl__ <br /> Supplemental Fuel None <br /> No o1 K10 barrels at site Full Empty <br /> PART$ SVE SYSTEM DATA <br /> System up or down upon arrival (If down please complete PART E) <br /> Hourrneter Reading C, 491�1 G'2� At time Jam' �� _ <br /> I) <br /> Flow Data Before Adjustment After Adjustment Final <br /> %Dilution air valve open oil a <br /> %Recirculation valve open » �� <br /> K/O Content al <br /> Vacuum 0 blower(in H2O) Q' <br /> Gauge Range <br /> AMPS drawn by blower motor AMPS f d 744? <br /> Total System Flow(A P,in HO) <br /> pipe Size 0v <br /> Well Field Air Flow(A P,in H2O) <br /> Pipe Size 0 4" J <br /> Dilution Air Flow(A P,'H2O) <br /> pipe51zeoll <br /> " <br /> If} <br /> Flfl Data W/Carbon W/O Carbon Difference <br /> S tem Influent y before dilution <br /> System Influent my after dilution <br /> S stem Effluent my tr �~ <br /> Field Instrument Used Last Caltbrated <br />