Laserfiche WebLink
SVE/GWE SYSTEM <br /> • FIELD MONITORING DATA SHEETS <br /> Date d Time of Arrival d <br /> Technician —y���. � J Time of Departure <br /> Site Engineer Was Site Engineer contacted from field? Yesly—No <br /> PART A GENERAL INFORMATION <br /> Site Location Chevron 9 5775,301 West Kettleman Lane, Lodi.CA Project No 77CH 43452 00 0550 <br /> Abatement Equip Falmouth Products Falco 100 Catal tic Oxidizer Serial No <br /> SVE Blower 5 hp motor, 15 5 Amp Max AMP Rating <br /> Telemetry --.51111,'hry MAX AMP Rating <br /> Electrical Power 230 V 3 phase-200 am <br /> Elect Meter Reading <br /> Supplemental Fuel None <br /> No of WO barrels at site Full l Empty <br /> PART B SVE SYSTEM DATA <br /> System up or down upon arrival �7 r%! /� (If down please complete PART E) <br /> Hourmeter Reading L �27 L � At time <br /> Flow Data Before Adjustment After Adjustment Final <br /> %Dilution air valve open <br /> %Recirculation valve open <br /> WO Content al <br /> Vacuum ®blower(in H2O) •. .� <br /> Gauge Range 0 �� v✓� <br /> AMPS drawn by blower motor AMPS 1 !J <br /> Total System Flow(a P,In H2O) <br /> Pipe Size <br /> Well Field Air Flow(A P,in H2O) c� <br /> Pipe Size 4' ! g� <br /> Dilution Air Flow(A P.'H2O) <br /> Pipe Size <br /> rl� <br /> FID Data W/Carbon W/O Carbon Drfference <br /> Sys <br /> tem Influent my before dilution <br /> System Influent my after dilution <br /> S stem Effluent my t <br /> Field Instrument Used Last Calibrated v <br />