Laserfiche WebLink
SVE/GWE SYSTEM <br /> S FIELD MONITORING DATA SHEETS <br /> Date <br /> f Time of Arrival —7 OU <br /> Technlcaan ���]]�+ <br /> Time of Departure Z U <br /> Site Engineer L/G Was Site Engineer contacted from field's Ye�No <br /> PART A GENERAL INFORMATION <br /> Site Location Chevron 9.5775 301 West Kettleman Lane Lada CA Project No 77CH 43452 00 0550 <br /> Abatement Equip Falmouth Products Falco 100 Catalytic Oxidizer Serial No <br /> SVE Blower 5 hp motor. 15 5 Amp Max AMP Rating <br /> MAX AMP Rating <br /> Telemetry �Uh 7 <br /> Electrical Power 230 V 3 phase—200 amp Elect Meter Reading P5 <br /> Supplements[Fuel None <br /> tj <br /> No of K/O barrels at site Full Empty <br /> PART B SVE SYSTEM DATA <br /> System up or down upon arrival IJ (If down please complete PART E) <br /> 0 Hourmeter Reading 1 % At time F-ll r,dh4 <br /> I) Flow Data Before Ad ustment After Adjustment Final <br /> °k Dilution air valve o n <br /> %Recirculation valve open <br /> K/O Content l <br /> Vacuum 0 blower(In H2O) <br /> Gauge Ran a <br /> AMPS drawn by blower motor AMPS <br /> Total System Flow(A P,in H2O) <br /> Pine Size <br /> Well Field Air Flow(A P,in H2O) 7 3_ <br /> PI Size 4" <br /> Dilution Air Flow(e P,"1-120) <br /> Pipe Slze <br /> li) <br /> RD Data W/Carbon W/O Carbon Difference <br /> 70 <br /> System Influent my before dilution Y� <br /> 5 stem Influent inv after ddutwn �� <br /> S stem Effluent my <br /> Last Calibrated C <br /> Field Instrument Used <br /> i <br />