Laserfiche WebLink
STANDARD OPERATING PROCEDURE - <br /> GROUNDWATER SAMPLING <br /> Gettler-Ryan Inc field personnel adhere to the following procedures for the collection and handling of <br /> groundwater samples prior to analysts by the analytical laboratory Prior to sample collection,the type of <br /> analysis to be performed is determined Loss prevention of volatile compounds Is controlled and sample <br /> preservation for subsequent analysis Is maintained <br /> Prior to sampling, the presence or absence of free-phase hydrocarbons Is determined using an Interface <br /> probe Product thickness,If present, Is measured to the nearest 0 01 foot and Is noted In the field notes In <br /> addition, all depth to water level measurements are collected with a static water level Indicator and are <br /> also recorded In the field notes, prior to purging and sampling any wells <br /> After water levels are collected and prior to sampling, temperature, pH and electrical conductivity are <br /> measured If purging Is to occur, each well Is purged a minimum of three well casing volumes of water <br /> using pre-cleaned pumps (stack, suction, Grundfos), or disposable bailers The measurements are taken a <br /> minimum of three times during the purging Purging continues until these parameters stabilize <br /> Groundwater samples are collected using disposable bailers The water samples are transferred from the <br /> bailer Into appropriate containers Pre-preserved containers,supplied by analytical laboratories,are used <br /> when possible When pre-preserved containers are not available, the laboratory Is Instructed to preserve <br /> the sample as appropriate Duplicate samples are collected for the laboratory to use In maintaining <br /> quality assurance/quality control standards The samples are labeled to Include the job number, sample <br /> Identification,collection date and time, analysis,preservation (if any), and the sample collector's Initials <br /> The water samples are placed In a cooler, maintained at 4oC for transport to the laboratory Once <br /> collected In the field,all samples are maintained under chain of custody until delivered to the laboratory <br /> The chain of custody document Includes the Job number,type of preservation,if any, analysis requested, <br /> sample identification, date and time collected, and the sample collector's name The chain of custody Is <br /> signed and dated (Including time of transfer) by each person who receives or surrenders the samples, <br /> beginning with the field personnel and ending with the laboratory personnel <br /> A laboratory supplied trip blank accompanies each sampling set and is labeled as QA For sampling sets <br /> greater than 20 samples, 5% trip blanks are Included The trip blank Is analyzed for some or all of the <br /> same compounds as the groundwater samples <br /> As requested by Phillips 66 Company, the purge water and decontamination water generated during <br /> sampling activities Is transported to Phillips 66 - San Francisco Refinery,located In Rodeo, California <br /> hV'omalphilhps-1osrWrke1 sop frro-t 1/11102 <br />