My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000801
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
ARCHIVED REPORTS XR0000801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 4:17:43 PM
Creation date
2/15/2019 2:33:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000801
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ile <br /> EMERGENCY CONTACT LISTING <br /> Nature of Emergency Phone Number Alternate Phone Number <br /> Ambulance 911 <br /> Fire 911 <br /> Police 911 <br /> Poison Control Center (800) 346-5922 (800) 342-9293 <br /> Office of Emergency <br /> Services 911 <br /> Chemical Spills (800) 424-8802 <br /> Hospital (209) 825-3500 1 911 <br /> Other Contingencies Pacific Environmental Group, Inc (916) 858-2350 <br /> 12.0 TRAINING REQUIREMENTS <br /> All personnel assigned to this project will be required to demonstrate that they have <br /> completed the Initial Training Requirements (40 hours), according to Federal OSHA <br /> Standards under 29 CFR 1910 120 <br /> Field personnel from PEG and their sub-contractors will attend a project briefing for safety <br /> issues and project work task review before beginning work All PEG site personnel shall <br /> have completed training relative to the project operations plans, and the materials to be <br /> encountered during the project <br /> 13.0 MEDICAL SURVEILLANCE <br /> PEG personnel and sub-contractors engaged in project operations shall be participants in the <br /> Medical Surveillance program, and must be cleared by the examining physician(s) to wear <br /> respiratory protection devices and protective clothing for working with hazardous materials <br /> The applicable requirements under Federal OSHA, 29 CFR 1910 will be observed <br /> A. Examination Requirements <br /> All PEG personnel on-site shall have successfully completed a pre-placement or periodic <br /> medical examination in accordance with established PEG policies and procedures, and <br /> consistent with the provisions of the OSHA carcinogen standards This examination shall <br /> include a complete medical and occupational history, physical examination, and selected <br /> biological sampling Laboratory studies include a complete blood count (CBC), urinalysis, <br /> 0 <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.