Laserfiche WebLink
CLEA.\`Up AND ABATEMENJ ORDER NO. 5-00-704 '4 <br /> FORMER CHEVRON STATION #9-5775 <br /> 101 WEST KETTLEMAN LANE <br /> LODI. SAN JOAQUIN COUNTY <br /> Site-Specific Investigation and Cleanup Tasks (continued) Com Iiance Date <br /> 3 Install and continuously operate a soil v=apor extraction system, and an 3 July 2000 <br /> interim pump and treat system in the area of the highest soil and <br /> groundwater MtBE contamination The interim pump and treat <br /> system must stabilize the groundwater plume to prey ent movement <br /> Of IMBE toward City Well 12. <br /> 4 Submit a complete Problem Assessment Report (PAR) acceptable to the 24 July 2000 <br /> Board and County staff, as described in Appendix A of the Tri-Regional <br /> Recommendations The PAR must include requirements for any <br /> discharge pem-iit(s) required and a time Iine for subrmttal of Report(s) of <br /> Waste Discharge. <br /> 5 Within 15-days of Board staff approval of the Problem Assessment 28 August 2000 <br /> Report,but no later than 28 August 2000, submit a sinal Remediation <br /> Plan(described to Appendix A) for the cleanup of the soil and <br /> groundwater at the site. <br /> 6 Within 30 days of Board staff approval of the selected Remedial Option, 6 October 2000 <br /> but no later than 6 October 2000, implement and continuously operate, <br /> the approved remediation system, with the exception of periodic and <br /> scheduled maintenance Any interruption in the operation of the <br /> cleanup system(s),other than for scheduled maintenance,without prior <br /> approval of the Executive Officer, is a violation of this Order. <br /> AI <br /> Reporting and Permits <br /> 7. Notify the Board and County staff at least two business days prior to any site work or sampling <br /> 8. Obtain all necessary local and state permits prior to beginning work, <br /> 9. Submit all reports and correspondence to the Board's Sacramento Office, the San Joaquin <br /> County Environmental Health Division, and all parties (or representatives) identified in this <br /> Order. Under penalty of perjury,the technical reports as directed,which shall be submitted to the <br /> Executive Officer of the Board, and to the County,must be signed by an appropriately licensed <br /> professional(technical reports and plans, including drilling logs and soil and groundwater <br /> sampling,are to be prepared,signed,and certified by a Registered Geologist,Registered Civil <br /> Engineer,Certified Engineering Geologist,or Certified Hydrogeologist). All registered <br /> professionals must be licensed by the State of Califomia. <br /> 10. Submit preapprovals with workplan and all reports with reimbursement requests to the State <br /> Water Resources Control Board Cleanup Fund in a timely manner to avoid delays that would <br /> result in non-compliance with this Order. <br />