Laserfiche WebLink
SVEIGWE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Dale 2-7: Time of Arrival <br /> Technician Time of Departure <br /> Site Engineer_ �f�� f r� Was Site Engineer contacted from field? Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location Chevron 9-5775-301 West Kettleman Lane Lodi CA Project No 77CH 43452 00 0550 <br /> Abatement Equip Falmouth Products Falco 100 Catal is Oxidizer Serial No <br /> SVE Blower 5 hp motor, 15 5 AmI2 Max AMP Rating 1 <br /> Telemetry / /`l/ ) MAX AMP Rating <br /> Electrical Power 230 V 3 phase-200 amo.-- <br /> ,� <br /> Elect Meter Reading <br /> Supplemental Fuel None <br /> No of K/O barrels at site Full Empty <br /> PART B SVE SYSTEM DATA <br /> System up or down upon arrival Of down please complete PART E) <br /> Hourmeter Reading / _. At time z/ <br /> Flow Data Before Adjustment After Adjustment Final <br /> %Dilution air valve o en <br /> %Recirculation valve open <br /> KIO Content al <br /> Vacuum 0 blower(in H2O) Q ► r <br /> Gauge Flange <br /> AMPS drawn!?y blower motor AMPS <br /> Total System Flow(A P,in H2O) <br /> Pipe Size 0 ' <br /> Well Field Air Flow(A P,In H2O) <br /> Pipe Sizg t 4" <br /> Dilution Air Flow(A P,'H2O) <br /> Pipe Size " <br /> ti) <br /> FID Data W/Carbon W/0 Carbon Difference <br /> System influent my before dilution <br /> System Influent my after dilution <br /> S stem Effluent my <br /> Field Instrument Used Last Calibrated <br />