Laserfiche WebLink
SVEIGWE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Date ��`--�` Time of Arrival <br /> Technician —s�f- �. `_1 Time of Departure 1 2 <br /> Site Engineer Was Site Engineer contacted from field? YesY- No <br /> PART A GENERAL INFORMATION <br /> Site Location Chevron 9 5775 301 West Kettleman Lane Lodi CA Project No 77CH 43452 00 0550 <br /> Abatement Equip Falmouth Products Falco 100 Catalytic Oxidizer , . Serial No <br /> SVE Blower 5 hp motor, 15 5 Amp Max AMP Rating �Sf <br /> Telemetry �9» - I MAX AMP Elating <br /> Electrical Power 230 V 3 phase-200 amp q $�Z) <br /> Elect Meter Reading <br /> Supplemental Fuel None <br /> No of K/O barrels at site Full �^Empty <br /> PART B SVE SYSTEM DATA <br /> System up or down upon arrival (If down please complete PART E) <br /> Hourmeter Reading e 6 46 • At time 7 -152 <br /> Flow Data Before Ad ustment After Adjustment Final <br /> %Dilution air valve open ff ps <br /> %Recirculation valve open 4r;) / <br /> �� Q <br /> WO Content al <br /> Vacuum @ blower(in H2O) <br /> Gauge Range 7� w e— <br /> �Q �C- <br /> AMPS drawn by blower motor AMPS a e' <br /> Total System Flow(A P,in H2O) <br /> Pipe Size " <br /> Well Field Air Flow(A P,in H2O) p <br /> MR2 Size 4 4" <br /> Dilution Air Flow(A f,"H2O) <br /> Pipe Size " <br /> 11} <br /> FIA Data W/Carbon W/O Carbon Difference <br /> System Influent v afore dilution <br /> System Influent v after dilution rr r <br /> .System Effluent my <br /> Field Instrument Used Last Calibrated l GZ <br />