Laserfiche WebLink
SVFJGWE SYSTEM <br /> 0 FIELD MONITORING DATA SHEETS <br /> Date f 45) �-r--� Time of Arrival -7 OU <br /> Technician e-� / Time of Departure 12— <br /> Site Engineer oc,r IE- Was Site Engineer contacted from held9 YeNo <br /> PART A GENERAL INFORMATION <br /> Site Location Chevron 9 5775 301 West Kettleman Lane Lodi CA Project No 77CH 43452 00 0550 <br /> Abatement Equip Falmouth Products Falco 100 Catal is Oxidizer Serial No <br /> SVE Blower 5hpmotor,-155Amp Max AMP Riling <br /> Telemetry -54n 7L7^d MAX AMP Rating <br /> Electrical Power 230 V 3 phase.-.200 am <br /> Elect Meter Reading O <br /> Supplemental Fuel None <br /> No of K/O barrels at site Full Empty <br /> PART 8 SVE SYSTEM DATA <br /> System up or down upon arrival (If down please complete PART E) <br /> Hourmeter Reading 1 At time <br /> FFlaw Data Before Adjustment After Ad ustment Final <br /> %Dilution air valve open / � <br /> %Recirculation valve open Iv d <br /> K/0 Content al <br /> Vacuum 0 blower(in H2O) op <br /> -.-Gauge Ran <br /> AMPS drawn by blower motor AMPS <br /> Total System Flow(A P,in H2O) <br /> Pipe Size 0 " <br /> Well Field Air Flow(A P,In H2O) <br /> pipe Size 4 4" <br /> Dilution Air Flow(A P,'H2O) <br /> PIP2 Size 0 " <br /> il) <br /> FID Data W/Carbon W/O Carbon DK2rence <br /> Sys )tem Influent my before dilution <br /> System Influent v after dilution <br /> System Effluent my �� 3t <br /> instrument Used Last Calibrated <br /> Field a� d <br />