Laserfiche WebLink
SVE/GWE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Date Time of Arrival 7 <br /> Technician Time of Departure <br /> Site Engineer G !1 Was Site Engineer contacted from field9 Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location Chevron 9-5775 301 West Kettleman Lane Lodi CA Project No 77CH 43452 00 0550 <br /> Abatement Egwp Falmouth Products Falco 100 Catalytic Oxidizer Serial No <br /> SVE Blower 5 hp motor, 15 5 Amp <br /> ) Max AMP Rating <br /> Telemetry .7 �/a/ MAX AMP Rating <br /> Electrical Power 230 V 3 phase--200 amp f�-7QG ` <br /> Elect Meter Reading CJ I <br /> Supplemental Fuel None <br /> No of WO barrels at site Full_ /_ ._Empty <br /> PART B SVE SYSTEM DATA <br /> System up or down upon arrival (If down please complete PART E) <br /> Hourmeter Reading G�• At time <br /> Flow Data Before Ad ustment After Adjustment Final <br /> %Dilution air valve open '—d 52� <br /> %Recirculation valve open 149 % �G <br /> K/O Content I <br /> Vacuum ash blower(in H2O) Q <br /> Gauge Range <br /> AMPS drawn by blower motor AMPS <br /> Total System Flow(A P.in H2O) <br /> Pipe Size 40 " <br /> Well Field Air Flow(A P.in H2O) g ( <br /> pipe Size 0 4" <br /> Dilution Air Flow(A P,"H2O) <br /> Pipe Size <br /> EI) <br /> FID Data WI Carbon W/O Carbon Difference <br /> System Influent my before dilution <br /> System Influent my after dilution <br /> S stem Effluent my 4 <br /> Field Instrument Used Last Calibrated <br />