Laserfiche WebLink
Chevron Products Company <br /> Porro Chevron Service Station#9-5775,301 West Kettleman Lane Umb,Cahfonva July 15,2002 <br /> List of Tables <br /> Table 1 Groundwater Gauging Data <br /> Table 2 Groundwater Analytical Results <br /> Table 3 Groundwater Extraction System Analytical Data <br /> Table 4 Groundwater Extraction System Performance Data <br /> Table 5 Soil Vapor Extraction System Mass Removal Data <br /> Table 5 1 Soil Vapor Extraction System MtBE Mass Removal Data <br /> Table 6 Soil Vapor Extraction System Emission Data <br /> List of Figures <br /> Figure 1 Site Location Map <br /> Figure 2 A-Zone Groundwater Elevation Contour Map <br /> Figure 3 B-Zone Groundwater Elevation Contour Map <br /> Figure 4 A-Zone MtBE Isoconcentration Contour Map <br /> Figure 5 Remediation System Site Plan <br /> Figure 6 Cumulative Groundwater Extraction Constituent Mass Removal <br /> Figure 7 Groundwater Extraction Influent Constituent Concentrations <br /> Figure 8 Cumulative Soil Vapor Extraction Constituent Removal <br /> Figure 9 Soil Vapor Extraction Influent Constituent Concentrations <br /> List of Appendices <br /> Attachment A Cleanup and Abatement Order No 5-00-704, dated April 20, 2000, <br /> Attachment B Monitoring and Sampling Field and Laboratory Procedures <br /> Attachment C Monitoring and Sampling Certified Analytical Reports, and Cham-of- <br /> Custody <br /> hain-ofCustody Record <br /> Attachment D Monitoring and Sampling Field Data Sheets <br /> Attachment E Operation and Maintenance Certified Analytical Reports, and Chain- <br /> of-Custody Record <br /> Attachment F Operation and Maintenance Field Data Sheets <br /> Attachment G Review Fourth Quarter 2001 Progress Report and Final Remediation <br /> Plan Addendum, dated March 13, 2002 <br /> 11Chevron1957751Penodic MonitonnglQuarterly Progress Reports1200212nd Quarter-2002 Progress Report doe <br />