Laserfiche WebLink
log sro <br /> 27 March 2007 / ✓ / �j, <br /> AGE-NC Project No. 97-0249 " <br /> Page 6 of 7 <br /> • MTBE was not detected in HU3 this quarter; well MW-14C was inaccessible and was not <br /> sampled this quarter. <br /> • 1,2-DCA was detected ingroundwater samples MW-lthroughMW-6,MW-8A and MW-10 <br /> (A, B) at maximum concentrations of 41 µg/1 from well MW-3. The estimated extent of <br /> dissolved 1,2-DCA in HU 1 is depicted on Figure 11. 1,2-DCA increased from non detect <br /> the second consecutive quarter in samples from wells MW-6 and MW-10A; 1,2-DCA was <br /> detected for the first time since sampling began in the sample from well MW-5. <br /> 5.0. RECOMMENDATIONS <br /> Based upon the results of the fust quarter 2007 investigation, AGE presents the following <br /> recommendations: <br /> • Continue quarterly ground water monitoring at wells MW-1 through MW-17; the second <br /> quarter ground water monitoring event was performed in April 2007,and a report of findings <br /> is forthcoming. <br /> • The adjacent Flag City Chevron is currently being considered for closure by the CRW QCB; <br /> due to the location and screen intervals of Flag City Chevron wells MW-11, MW-12, <br /> MW-13,MW-16,MW-17 and MW-18 on or near the 3B's property,responsibility of these <br /> wells should be transferred to the 3B's investigation. <br /> • Due to marginal delineation of the soil plume,additional soil investigation may be warranted <br /> beneath the former UST area, in the current gasoline and diesel fuel dispenser areas, and <br /> west-northwest of MW-3, which should coincide with the installation of any future <br /> remediation wells (i.e. soil vapor extraction wells). <br /> • Generally,the core of the dissolved petroleum plume appears to located in HU 1 within the <br /> area of wells MW-1, MW-2, MW-3, MW-6, MW-8 and MW-10; outside of the dissolved <br /> petroleum core area,only low petroleum concentrations have been detected on-site towards <br /> the north (MW-5), and towards the southwest (Flag City Chevron MW-13). Based on the <br /> data collected during the first quarter 2007,additional ground water monitoring wells are not <br /> warranted at this time and the existing monitoring well network may be sufficient to <br /> complete a site Corrective Action Plan (CAP). <br /> Advanced GeoEnvironmenfal,Inc. <br />