My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 5:26:40 PM
Creation date
2/15/2019 2:44:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM -4- <br /> FLAG CITY CHEVRON,6421 CAPITOL AVENUE,LODI <br /> SAN JOAQUIN COUNTY <br /> An annual report shall be submitted to the Regional Board by 30 April of each year. This report <br /> shall contain an evaluation of the effectiveness and progress of the investigation and remedial <br /> actions. The annual report shall contain the following minimum information: <br /> (a) Groundwater contour maps and contaminant concentration maps containing all data <br /> obtained during the previous year; <br /> (b) Graphical summaries (time-series or trend graphs) of historical data obtained to date; <br /> (c) A discussion of the long-term trends in the concentrations of the pollutants in the <br /> groundwater monitoring wells; <br /> (d) An analysis of whether the contaminant plume is being captured by an extraction system or <br /> is continuing to spread; <br /> (e) A description of all remedial activities conducted during the year, an analysis of their <br /> effectiveness in removing the contaminants, and plans to improve remediation system <br /> effectiveness; <br /> (f) The anticipated date for completion of cleanup activities; <br /> (g) An identification of any data gaps and potential deficiencies/redundancies in the monitoring <br /> system or reporting program; <br /> (h) If desired, a proposal and rationale for any revisions to the groundwater sampling plan <br /> frequency and/or list of analytes. <br /> The results of any monitoring done more frequently than required at the locations specified in the <br /> MRP also shall be reported to the Regional Board. The Discharger shall implement the above <br /> monitoring program as of the date of the Order. <br /> r <br /> Ordered by: rjL,�) <br /> ) w�yz. <br /> THOMAS R. PINKOS, Executive Officer <br /> S� 03 <br /> ate) <br />
The URL can be used to link to this page
Your browser does not support the video tag.