Laserfiche WebLink
State Water Resources Control Board <br /> Peter i11. Rooney John P.Caffrey,Chairman Pete Wilson <br /> t1 V, Governor <br /> Secretaryfor Division of Clean Water Programs ,�.j <br /> Environmental 2014 T Street,Suite 130•Sacramento,California 95814•(916)227-6010 FAX(916)2274530 <br /> Protection Mailing Address: P.O.Box 944212•Sacramento,California•94244-2120 <br /> Internet Address: http://www.smcb.ca.gov/ cwphome/ustef/fundhome.htm <br /> June 25, 1998 <br /> Richard Bokides <br /> Bokides Family Limited Partnership <br /> 6421 Capitol Ave <br /> Lodi, CA 95242 <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS,CLAIM NO. 9209, <br /> SITE ADDRESS: 6421 CAPITOL AVE W, LODI,CA 95242 <br /> I have reviewed your request,received on June 3, 1998, for pre-approval of corrective action costs. With the <br /> following provisions and clarifications from Mike Infurna of San Joaquin County EHD (County), the total cost <br /> pre-approved for completing the January 28, 1998,Advanced GeoEnvironmental workplan approved by the <br /> County on February 24, 1998, is not to exceed$16,100. The pre-approved amount includes costs for activities <br /> related to the installation of three dual-completion wells and a quarterly groundwater monitoring and sampling of <br /> both new and existing wells. Such activities consist of project management, drillings,materials, equipment, <br /> permit/permitting,report preparation, well development/survey, and laboratory analyses (TPHg/d,BTEX,MtBE, <br /> and other oxygenates). Upon completion of each phase of work,you are required to submit the results to the <br /> County and the Fund for reviews. <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: all reasonable and necessary <br /> corrective action costs for work directed and approved by the County will be eligible for reimbursement per the <br /> terms of your Letter of Commitment at costs consistent with those pre-approved in this letter. <br /> All future costs for corrective action must be approved in writing by Fund staff. Future costs for corrective <br /> action must meet the requirements of Article 11, Chapter 16, Underground Storage Tank Regulations. <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs on the new <br /> scope of work. <br /> • Although I have referred to the Advanced GeoEnvironmental proposal in my pre-approval above,please be <br /> aware that you will be entering into a private contract: the State of California cannot compel you to sign any <br /> specific contract. This letter pre-approves the costs as presented in the proposal dated May 21, 1998 by <br /> Advanced GeoEnvironmental for conducting the work approved by the County for implementing the January <br /> 28, 1998,Advanced GeoEnvironmental workplan. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval before you <br /> will be reimbursed. To make this easier, insure that your consultant prepares his invoices to match the format <br /> of the original estimate, and provides reasonable explanations for any changes made in the scope of work or <br /> increases in the costs. When the invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> California Environmental Protection Agency <br /> Recycled Paper <br />