My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 5:26:40 PM
Creation date
2/15/2019 2:44:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Saddle City Chevron <br /> Page 2 <br /> A workplan and an application for a boring permit along with an 589.00 fee shall be submitted <br /> immediately. The report of findings for this phase of investigation and any resultant mitigation following <br /> the tank removal shall be submitted to PHS-EHD by April 1, 1994. <br /> If over-excavation of the tank pit area at the time of the tank removal is to be conducted, please make <br /> your intentions known in the closure plan. Additional requirements need to be met in order for this <br /> Corrective Action Plan to proceed. <br /> Monitoring of the three (3) existing monitoring wells currently on site (i.e., depth to water measurements, <br /> hydraulic gradient calculations, and groundwater direction) shall be conducted on a quarterly basis with <br /> reports submitted to PHS-EHD within thirty (30) days of the event. Sampling frequency shall be on a <br /> quarterly schedule also unless a written request to modify it is received and approved by PHS-EHD. <br /> Please include a schedule of the sampling events should you choose to modify the quarterly requirements. <br /> Please direct your tank closure/removal plan and questions to Pam Violett, Senior REHS, at (209) <br /> 468-0335. <br /> Workplan, applications for boring permits, and reports of findings should be directed to Michael Infurna, <br /> Senior REHS. <br /> Ernest M. Fujimoto, M.D., M.P.H. <br /> ding Health Officer <br /> Diane M. Hinson, Supervising R.E.H.S. <br /> Environmental Health Division <br /> DMH/MI:Ib <br /> c: Pam Violett - PHS-EHD Unit III <br /> c: Brett Hunter - Chevron USA <br /> c: Raynold I. Kablanow II - Geological Technics Inc. <br /> c: Richard Bokides - Saddle City Chevron <br /> c: Jose Alva - Attorney <br /> c: CVRWQCB - Elizabeth Thayer <br /> c: SWRCB - Susan Phillips <br />
The URL can be used to link to this page
Your browser does not support the video tag.